Industry Directory | Equipment Dealer / Broker / Auctions / Manufacturer
Buyers and sellers of used assembly machinery.
Industry Directory | Manufacturer
PWB designs and manufactures test equipment and provides services to test the reliability of Printed Circuit Boards.
New Equipment | Education/Training
This 3-day, lectured course utilizes the images in the IPC-A-610 inspection document to provide visual accept/reject criteria examples for all three classes of assembly production–in both lead and lead-free. The IPC-A-610, “The Acceptabil
New Equipment | Education/Training
This 4-day, lectured course utilizes the images in the IPC-A-610 document to provide visual accept/reject criteria examples for all three classes of assembly production–for both lead and lead-free. The IPC-A-610, “The Acceptability of Ele
Electronics Forum | Mon Feb 02 11:51:23 EST 2004 | prs
Hello, I'm working with Nelco 4000-13 material .031 thk and am experiencing some warping. the board is roughly 1" by 3" and the warping is in the long dimension. The grain on the panel is also in the long dimension. Any pointers or advice on contr
Electronics Forum | Mon Feb 02 16:42:03 EST 2004 | davef
Bow & twist for bare boards and panels: IPC-A-610 1.5% for PTH only and 0.75% for SMT. So, what are you doing to these poor boards to make them warp?
Used SMT Equipment | Pick and Place/Feeders
Board size standard specification 50×50 ~ 1,200×360mm Longer sized PWB*1 50×50 ~ 1,500×360mm Component height 6mm/12mm Component size 0603(0201) ~ □33.5mm Placement speed (chip) Optimum 27,100CPH IPC9850 19,300CPH Placement ac
Used SMT Equipment | Chipshooters / Chip Mounters
Chip 90,000CPH (0.040Sec. / chip / Optimum)66,000CPH (IPC9850) 0402mm(01005 inch) ~ 33.5mm×33.5mm Laser recognition : ±0.05mm(±3σ) On-the-fly centering using integrated laser 2 stations, 4 gantries, 4 placement heads, 24 nozzles Linear servo mot
Industry News | 2003-05-02 08:58:57.0
Bob Ferguson has been appointed PWB General Manager, North America.
Industry News | 2003-02-03 11:33:39.0
Will Consolidate Its PWB Business by the End of Next Year
Parts & Supplies | Circuit Board Assembly Products
Juki SAFETY BOARD B ASM PWB BOARD
Parts & Supplies | Assembly Accessories
E86137290A0 JUKI 2010 2020 2030 2040 HEAD MAIN PWB BOARD More information about Products please Contact US at jenny@ksunsmt.com or visit www.ksunsmt.com
Technical Library | 2012-04-26 18:52:37.0
First presented at IPC Apex Expo 2012. The reliability, as tested by thermal cycling, of printed wire boards (PWB) are established by three variables; copper quality, material robustness and design. The copper quality was most influential and could be eva
Technical Library | 2009-01-01 16:37:38.0
Recent technology advancement has enabled enhancement in PWB electrical performance and wiring density. These innovations have taken the form of improved materials, novel PWB interconnect structures, and manufacturing technology. One such advancement is Z-axis conductive interconnect. The Z-interconnect technology involves building mini-substrates of 2 or 3 layers each, then assembling several mini-substrates together using conductive paste.
E86017230B0 ATS CONTROL BOARD E86017250A0 CONTROL PWB ASM. E8601725AA0 CONTROL PWB ASM. E86017260A0 MTC CONTROL BOARD E8601726AA0 CLT BOARD AA ASM E86017270A0 BACK BOARD ASM E86017290A0 SAFETY BOARD ASM. E86017290B0 SAFETY BOARD B ASM.
40001096 CENTERING PIN 2.5 40001097 CENTERING PIN 2.0 40001098 CENTERING PIN 1.9 40001099 CENTERING PIN 1.8 40001109 MNLA HEAD ASM. 40001110 MNLA HEAD BRACKET AS 40001113 T PULLEY 1 40001114 T PULLEY 2 E86887000A0 LED PS PWB ASM E8688700
Training Courses | | | IPC-600 Specialist (CIS)
The Certified IPC-600 Specialist (CIS) training targets quality assurance and acceptance of bare printed circuit boards.
Training Courses | | | IPC-600 Trainer (CIT)
The Certified IPC-600 Trainer (CIT) courses recognize individuals as qualified trainers in the area of quality assurance of bare printed circuit boards and prepare them to deliver Certified IPC-600 (CIS) training.
Events Calendar | Tue Dec 11 00:00:00 EST 2018 - Tue Dec 11 00:00:00 EST 2018 | ,
Inspecting PWB Assemblies for Defects
Events Calendar | Tue Apr 13 00:00:00 EDT 2021 - Tue Apr 13 00:00:00 EDT 2021 | ,
Boston Chapter Webinar: Cleaning Chemistry For PWB and Rework - Part 2, session 1
Career Center | Wylie, Texas USA | Engineering,Production,Quality Control
Candidate needed for source inspection to the requirements of Mil-P-55110 IPC 6011, class 1,2 and 3 IPC 6012, class 1,2 and 3, PWB-PWG, Exp. with PWA and soldering necessary.
Career Center | , Ontario Canada | Maintenance
Title: Technologist � Mechanical SMT (Position based in London, Ontario) Basic Purpose of Position: To set-up, operate, calibrate, program, troubleshoot and adjust surface mount and through-hole technologies PWB assembly, soldering and cleaning equ
Career Center | Poplar Grove, Illinois | Engineering,Production,Quality Control,Technical Support
Please see resume.
Career Center | , Minnesota USA | Engineering,Management,Production,Quality Control,Technical Support
Engineer with a diverse background in management, quality, computer and customer service. Experience includes optics, electrical, mechanical, physics, chemistry, process and systems engineering, implementing computers and computer applications for m
Design and Construction Affects on PWB Reliability SMTnet Express April 26, 2012, Subscribers: 25100, Members: Companies: 8853, Users: 33038 Design and Construction Affects on PWB Reliability First presented at IPC Apex Expo 2012 by: Paul
KingFei SMT Tech | http://www.smtspare-parts.com/sale-11686254-original-smt-pcb-assembly-juki-carry-pwb-e86177210a0-juki-750-conveyor-board.html
Original SMT PCB Assembly JUKI Carry PWB E86177210A0 JUKI 750 Conveyor Board Leave a Message We will call you back soon! Your message must be between 20-3,000 characters
| https://www.smtfactory.com/What-is-the-production-process-of-Semi-auto-SMT-Production-Line-id40572477.html
carried out in the following order. PWB board/screen data input→printing condition data input→check data input→cleaning data input→supplemental data input The above data needs to be compiled mainly for the first item (PWB and screen data), the second item