Overview • Almost 60 times faster than the original 80C51 • Almost 5 times faster than 80C251 - at the same frequency • Quad-Pipelined architecture DQ80251 is a revolutionary Quad-Pipelined ultra high performance, speed optimized soft cor
Overview • Almost 30. times faster than 80C51 • Quad-Pipelined architecture • 24 times faster multiplication (12 times division) DQ8051XP is an ultra high performance, speed optimized soft core, of a single-chip 8-bit embedded control-ler, de
Electronics Forum | Wed Apr 15 08:01:08 EDT 2009 | leemeyer
In the early days Quad machines were fitted with an alignment system that was purchased from a company named Cyberoptics. Quad then developed their own alignment system and called it Quadalign.
Electronics Forum | Mon Apr 13 14:48:38 EDT 2009 | bobpan
There is also a modify code that if set to 0 the quad-align will not turn on and you will have this error. It is one of the higher mod codes around 60-80......been so long i forget.... Good Luck Bob
Used SMT Equipment | Pick and Place/Feeders
Quad IV-C pick and place:computer & software, 2 monitors downward looking camera 2 nozzle holders Power Requirement: 110 Volts Shipping Weight: 1300 lbs. Dims: 48"L x 48"W x 69"H Manual Included In Good Condition
Used SMT Equipment | Pick and Place/Feeders
Complete QUAD IVc Mk2 Pick and Place Assembly Line Three Pre-Owned Quad IVc Mk2 Pick and Place Machines with 120 tape assorted feeders, 5 vibrating tube feeders and one MT-20 matrix tray feeder elevator containing 20 shelves. Machine comes a Centra
Industry News | 2005-06-02 07:01:43.0
New SMTech / Quad replacement Display and Powerboards now available from Reprint Ltd
Industry News | 2008-06-30 14:17:39.0
LOS ALAMITOS, CA � June 30, 2008 � Practical Dummy Components is now supplying the Amkor FusionQuad�, representing a breakthrough in leadframe-based plastic packaging through the effective integration of ExposedPad� QFP and MLF� technologies.
Parts & Supplies | Assembly Accessories
Samsung SM321 mid-section conveyor belt J6602083A The following samsung parts are all availble: J91691001A FEEDER_BOARD_BRK_ASSY J91691001A J90571006A_AS FEEDER_BASE_MODULE J70570260C TOP PLATE J68081070A HANDLE_NUMBER_STICKER J6001400650 SOC
Parts & Supplies | Assembly Accessories
Reel Stopper Assy J9065205A J9065092A Other Samsung parts on sale: J91691001A FEEDER_BOARD_BRK_ASSY J91691001A J90571006A_AS FEEDER_BASE_MODULE J70570260C TOP PLATE J68081070A HANDLE_NUMBER_STICKER J6001400650 SOCKET HEAD CAP SCREW[M4*6 (SUS)]
Technical Library | 2024-07-24 00:51:44.0
A blade server system (BSS) utilizes voltage regulator modules (VRMs), in the form of quad flat no-lead (QFN) devices, to provide power distribution to various components on the system board. Depending on the power requirements of the circuit, these VRMs can be mounted as single devices or banked together. In addition, the power density of the VRM can be high enough to warrant heat dissipation through the use of a heat sink. Typically, at field conditions (FCs), the BSS are powered on and off up to four times per day, with their ambient temperature cycling between 258C and 808C. This cyclical temperature gradient drives inelastic strain in the solder joints due to the coefficient of thermal expansion (CTE) mismatch between the QFN and the circuit card. In addition, the heat sink, coupled with the QFN and the circuit card, can induce additional inelastic solder joint strain, resulting in early solder joint fatigue failure. To understand the effect of the heat sink mounting, a FEM (finite element model of four QFNs mounted to a BSS circuit card was developed. The model was exercised to calculate the maximum strain energy in a critical joint due to cyclic strain, and the results were compared for a QFN with and without a heat sink. It was determined that the presence of the heat sink did contribute to higher strain energy and therefore could lead to earlier joint failure. Although the presence of the heat sink is required, careful design of the mounting should be employed to provide lateral slip, essentially decoupling the heat sink from the QFN joint strain. Details of the modeling and results, along with DIC (digital image correlation) measurements of heat sink lateral slip, are presented.
2015 Europlacer iiNeo Auction December 1, 2016 www.xlineassets.com
Enter PACE’s TF Series BGA/SMD Rework Systems. With its groundbreaking, patented Inductive-Convection Heating Technology, the TF Series top-side heater reaches the target temperature in just seconds for safe, rapid solder joint reflow in virtually an
Career Center | Ossining, New York USA | Production,Technical Support
We require a production operator to help us set up and run a Quad IVc doing prototypes and small initial production runs. Other equipment includes Zevatech 460, SMT screen printer, APS 12AC oven. Company starting up, hope to make into full time busi
Career Center | Bangalore-85, ka India | Production
As a Sr.Technician involved in production activities like programming, taking care of the production, process, rectifying the process problems, constantly getting in touch with the customers for any quality issues & other production activities, invol
Career Center | Columbus, Ohio USA | Engineering,Management,Production,Quality Control,Research and Development,Technical Support
20 plus years of experience in a Electronics Manufacturing environment. Management experience on 1st and 2nd shift with groups up to 18 in a goverment contracted environment Experienced internal/lead auditor of ISO 9001 with years of audit experi
| https://pcbasupplies.com/tmt-5000s/
! 469-200-1289 Login or Sign Up 0 Search × Search × Main Menu Shipping & Returns Contact Us Blog Shop By Category Circuit Repair Hand Tools BEAU TECH Tool Kits Double End Miniture Size Double End Standard Size Orange Sticks Rochard 1 MIL Probe Rochard 10 MIL Probe Rochard
ASYMTEK Products | Nordson Electronics Solutions | https://www.nordson.com/en/divisions/dage/about/blog/why-invest-in-inventory-management
. Manually counting components often takes up to 5 minutes per reel, especially when considering that results must be recorded and updated on paper and/or digitally