Electronics Forum | Fri Oct 11 07:56:32 EDT 2024 | oxygensmd
Our plan is havint 500x250 LED PCB.
Electronics Forum | Sat Oct 05 06:44:04 EDT 2024 | oxygensmd
If somebody can provide me with the software to let me test and learn how to program this machine would be really nice. As having manual too.
Used SMT Equipment | AOI / Automated Optical Inspection
BF-Frontier II Board Size : 60x50~500x460mm Borrd Cleatrance : Top 40mm Bottom 40mm Very good workin condition
Used SMT Equipment | AOI / Automated Optical Inspection
SAKI AOI BF-Frontier II Resolution 18μm Board size:460×500mm Dimension:850 × 1340 × 1230mm weight:450kg Product description: SAKI AOI BF-Frontier II, Resolution 18μm, Board size:460×500mm, Dimension:850 × 1340 × 1230mm, weight:450kg
Industry News | 2012-10-10 17:45:02.0
ASC International, have entered into an agreement that will focus on sales and service of SAKI’s 2D & 3D AOI and X-ray product line in the North American market.
Industry News | 2015-09-03 17:09:35.0
Saki Corporation announce the grand opening of their new facility in Fremont, California. An open house is being held on September 10, 2015, from 10:00AM to 6:00PM. Special demonstrations of Saki's true 3D and 2D automated optical inspection and measurement equipment will be available and Lean Stream will demonstrate Fuji's AIMEX IIS flexible placement platform.
smt equipment part SAKI AOI BF-frontier II used second hand smt machine EXTENSION ELECTROMECHANICAL EQUIPMENT(HK) COMPANY LIMITED Add:Building 703,Pengji Industrial zones,Liantang,Luohu District,Shenzhen,China Tel:0086-755-2572454 Emali:fuji
Career Center | Delhi, India | Engineering,Production,Quality Control
Programming, Operation, Maintenance,Troubleshooting of SMT machines. Programming of cyber optics/saki(AOI) Programmingn of pcb seperater Temperature profiling (Making & Soldering) Testing,Troubleshooting of microcontroller based PCAs
Career Center | Parañaque, Philippines | Maintenance
JOB DESCRIPTION Preventive Maintenance Execution of Preventive Maintenance activities, using the following frame work: Machine Cleaning, Inspection, Lubrication, Repair, Replace and Calibration. PM Documentation PM Master schedule PM Checklist Wo