Electronics Forum | Fri Sep 02 11:26:50 EDT 2011 | steffenr
Overkill for sure! Program to BOM: Shouldn't have to verify the program to the BOM once it's been verified unless there is a change. Feeder to BOM" There should be some type of instruction that specifies that part goes on what feeder and where the
Electronics Forum | Thu Feb 16 02:44:03 EST 2012 | fadzril
Dear all, Have anyone deal with X-Out boards? These defects are declared if one cavity or more from multi cavity boards are defective. There have been a request to use these boards in order to reduce the multi cavity board spoilage at supplier. Ho
Electronics Forum | Mon Jan 21 06:04:12 EST 2013 | bobpan
Some things to try.....keep in mind it has been over 10 years since i programmed one of those machines. 1. Tep Vision is what you should be using. I think it was called tep vpass in older software. 2. Maybe try goto 0 instead of goto 1. 3. Make sure
Electronics Forum | Fri Mar 23 02:18:37 EDT 2012 | smtronic
Thank you for your response. I did this: I changed the whole machine FCM and the FCM II, as you write me everything changed. Programmed new EPROM, etc. FCM machine and it works perfectly as FCM II. Only now I've changed the option to push mechanicall
Electronics Forum | Sat Apr 21 07:24:01 EDT 2012 | doremi
Just found from another discussion : “The Yestech (pattern match) is very easy to program and use but it took sooooo much up-keep to keep the false calls to a manageable amount. The CyberOptics (also Omron) is more of an algorithm based type of mach
Electronics Forum | Sat Jul 07 11:45:26 EDT 2012 | btipcb
I purchased and am setting up a used QSA30. It has been a little frustrating but I finally have an almost program. The isse is that I can not generate a placement program because it says that the ANC is not registered. I can look at it on the sy
Electronics Forum | Thu Dec 06 08:16:04 EST 2012 | emeto
Hi, After you define what Hegemon sudgested, and you build your matrix you should still evaluate the machines inhouse if you can or at the manufacturers side. For me the most important parameter on a machine is the changeover time. Some machines you
Electronics Forum | Fri Dec 28 02:31:54 EST 2012 | sarason
UFOS is the language of that generation of philips/Yamaha Surface mount machine. Indeed there are other commands. My program PCBSynergy, generates 2 variations of UFOS that will likely program that machine. Unfortunately my copy of these is in storag
Electronics Forum | Thu Jan 31 08:27:32 EST 2013 | phase1
Hello, We have just aquired an MV-2HTL AOI with the NG marker option. We are looking for someone familiar with these machines to provide training. I have programmed a board already using the manuals but am not confident as to what values and passing
Electronics Forum | Sat Feb 16 22:19:11 EST 2013 | mdang
Hi, I bought a fuji Flexa v4.6.0.7 and hook it hook it up with CP65 machine. The flexa system already have CP65 configure so I can see the production program on the machine and delete them but I can not transmit a new program to the machine. It error