Used SMT Equipment | AOI / Automated Optical Inspection
Saki BF-Planet-X for sale. -. Manufacture : Saki -. Model : BF-Planet-X -. Machine type : Inline post-reflow AOI -. Vintage: 2006 -. Conveyor configuration : Left to Right / Front fixed rail -. Max. PCB Size: 330 x 250mm (M Type) -. Res
Used SMT Equipment | AOI / Automated Optical Inspection
SAKY BF-PLANET-X With a superior resolution of 10μm and scanning line color CCD camera, both AOI system provide accurate and stable inspection results. Solder fillets on components as small as the high density mounted 01005(0402) chip, as well a
For M-size boards, this inline, high-speed, space-saving model, at only 60cm wide, has the smallest footprint in its class. It handles boards of 330x250mm and scans them in only 4 seconds.
New Equipment | Test Equipment
SAKI 2D AOI BF-Planet-X II Resolution 10μm Board size:330x250mm Dimension:600 × 915 × 1270mm, weight:Approx. 275kg Product description: SAKI 2D AOI BF-Planet-X II Smallest footprint, inline, high speed, Resolution 10μm, Boa
New Equipment | Test Equipment
SAKI 2D AOI BF-Planet-X II Resolution 10μm Board size:330x250mm Dimension:600 × 915 × 1270mm, weight:Approx. 275kg Product description: SAKI 2D AOI BF-Planet-X II Smallest footprint, inline, high speed, Resolution 10μm, Bo
New Equipment | Test Equipment
SAKI 2D AOI BF-Planet-X II Resolution 10μm Board size:330x250mm Dimension:600 × 915 × 1270mm weight:Approx. 275kg Product description: SAKI 2D AOI BF-Planet-X II Smallest footprint, inline, high speed, Resolution 10μm, Board
SAKI 2D AOI BF-Planet-X II Resolution 10μm Board size:330x250mm Dimension:600 × 915 × 1270mm, weight:Approx. 275kg Product description: SAKI 2D AOI BF-Planet-X II Smallest footprint, inline, high speed, Resolution 10μm, Board size:330x250mm,
Electronics Forum | Wed Sep 29 05:30:59 EDT 2010 | patejl
Hi We have a problem here in the company with AOI system, most of the problem is lifted lead on qfp components.We are using SAKI BF-planet-x. Most of the defects like mising components 603 or 402 are no problem but if it comes to lifted lead even
Career Center | Parañaque, Philippines | Maintenance
JOB DESCRIPTION Preventive Maintenance Execution of Preventive Maintenance activities, using the following frame work: Machine Cleaning, Inspection, Lubrication, Repair, Replace and Calibration. PM Documentation PM Master schedule PM Checklist Wo