Electronics Forum | Sun May 11 10:24:35 EDT 2003 | pjc
A much greater material cost savings has been realized by companies going to China for their product manufacture. It's not so much the labor man, its the material. Metal, plastic, composites and electronic components are way cheaper there than here.
Electronics Forum | Fri Nov 21 02:10:08 EST 2008 | alan5969
My name is Yuan, i am tech support from Lucida Technology Co Ltd. Our current product is thin client. As our businesses grow, we are looking for Contract Electronics Manufacturing Company or factory to taking over our SMD, assemble and testing to fi
Electronics Forum | Tue Oct 25 14:33:13 EDT 2005 | travelinman
I dont know if you found anyone to do your inspection and sorting in China but I am the owner of Strategic Manufacturing Solutions LLC and we do contract manufacturing and have an indepentant inspection lab in Shanghai. We could be reach at 847.359.
Electronics Forum | Mon Mar 30 06:41:22 EDT 2020 | jameshayliie
Convert CAD Data into a Placement Program Contract Manufacturing Handle to have a fast and easy way to convert your CAD data into a placement program. Recently I purchased some PCBs from Greatpcb and Cplfpc for my college project.
Electronics Forum | Fri Apr 10 10:20:15 EDT 2020 | unisoft
Yes process engineers that work for contract manufacturers try to get the full CAD or XY rotation files from their clients unfortunately still many of their customers still give them only Gerber files for the PCB project. Unisoft has had a focus on
Electronics Forum | Sat May 12 15:21:00 EDT 2001 | edmentzer
We are also a medium volume, high mix contract manufacture, last year we purchased a MYDATA MY12 with Linescan and Hydra. It is a great machine. We had a MultiTroniKs before but it was not as good as the MY-12. The MYDATA will do everything and do
Electronics Forum | Wed Apr 15 18:37:15 EDT 2020 | unisoft
The point here is if you can't get the full CAD files or the XY rotation files and all you get his Gerbers and a BOM. Most all contract manufacturers and some OEM's at some time or another have to deal with Gerber only files. If you find yourself i
Electronics Forum | Tue Mar 18 11:53:58 EDT 2014 | sara_pcb
Our contract manufacturing agency have procured pcbs from approved vendor. After assembly we found solder mask separated from the PCB on the epoxy area as patches. The top side is intact. also over the pcb tracks, the mask got damaged. In what c
Electronics Forum | Fri Jul 08 18:48:50 EDT 2005 | mdang
Hi, We are a Contract Manufacturing and have a project which has a few Xilinx BGA on top and bottom side. Does anyone run a cross this or have any suggestion on how to reflow them. Thank you, -Michael
Electronics Forum | Fri Apr 18 14:25:51 EDT 2014 | horchak
what is the technology? Is there fine pitch, double sided, number of layers, lead free? If the pcbs are not of the highest quality you may be set up for failure with no clean process. Couple things to look at is your paste flux content versus medal