Electronics Forum | Wed Jul 10 10:25:54 EDT 2019 | mikekeens
The merge software looks good but still not always getting the results i want - The following website can carry out a BOM to centroid xy placement data merge - http://www.surfacemountprocess.com/centroid-file-generation-service.html
Electronics Forum | Fri Feb 22 13:55:27 EST 2019 | bruce_mackean
Is there a need for a simple application to merge a bill of material with the xy placement data into a single (or top/bottom) files for machine programming? ie. add a part number column to the xy data, including "N/A" for parts not found in the BoM?
Electronics Forum | Thu Nov 11 17:04:31 EST 1999 | Michael Parker
I am looking for advice on sourcing a x,y digitizer to create pick and place files, off-line, rather than programming with the machine. I could use original gerber data or create the placement coordinates with the digitizer. Also, references to equip
Electronics Forum | Wed Feb 27 19:05:18 EST 2019 | bruce_mackean
Thanks for the link Phil. I am trying it out. Here is a quick demo of SMTMerge. https://youtu.be/nHe3-8kVHk4 Cheers, Bruce
Electronics Forum | Wed Feb 27 19:08:54 EST 2019 | bruce_mackean
Thanks for the info. I was having trouble finding SMTMaestro until Phil posted a link. I guess it is a little dated. Here is a quick demo of SMTMerge. https://youtu.be/nHe3-8kVHk4 Cheers, Bruce
Electronics Forum | Wed Feb 13 17:29:25 EST 2002 | Sheri Connor
I am looking for advice on sourcing a x,y > digitizer to create pick and place files, > off-line, rather than programming with the > machine. I could use original gerber data or > create the placement coordinates with the > digitizer. Also, refe
Electronics Forum | Sat Feb 12 13:19:27 EST 2011 | tpappano
A simple trick I read either here or on another P&P forum is to use "Silly Putty". Place a small thin spot of Silly Putty on the top of the front conveyor rail, and put the machine in "manual" mode. Steer head #1 over the putty and lower it, leavin
Electronics Forum | Sun Jul 14 05:37:17 EDT 2002 | johnw
Hi all bga placcement on an ip2 can is possible although as pointed out the x/y dimensionsof the part are used for placement I would suggest you arrange for your parts to be taped and reeled as this is the prefered way to go what size are the bga,s
Electronics Forum | Wed Feb 16 12:56:44 EST 2011 | gabriel1blue
Thank you, I have the program done and ready to run, but Im not able to get the machine to move to the mount location automatically, you say to highlight the location and press shift + P or T but how do I highlight the x,y data 1st? Or is this done o
Buy and selling used smt,semi, Robot ,CNC and all used machines
Equipment Dealer / Broker / Auctions
DONGGUAN HUMEN
Dongguan, 30 China
Phone: 13560819457