Electronics Forum: baking pcba assy (Page 1 of 5)

PCBA baking prior to rework

Electronics Forum | Mon Oct 14 18:27:38 EDT 2002 | kennyg

In regards to baking an assembly prior to hot air (BGA) rework.... 1) Do people always bake, sometimes or never? Does this depend on whether MS sensitive components are near the rework site? If a BGA is to be removed and reballed, baking is a no-br

PCBA baking prior to rework

Electronics Forum | Tue Oct 15 10:12:44 EDT 2002 | davef

1) Do people always bake, sometimes or never? Does this depend on whether MS sensitive components are near the rework site? If a BGA is to be removed and reballed, baking is a no-brainer. Sometimes, based on the proximity of the MS components. >2)

MSL control

Electronics Forum | Wed Mar 15 13:35:40 EDT 2017 | scotceltic

I have a double sided PCBA setup. I have MSL components on both assembly sides. When I run Assy Side one I am within the allotted hours remaining on the MSL component. I then wait 40 hours before running 2nd Assy side. By then the hours on the 1s

Baking time for PCBA rework

Electronics Forum | Thu Jan 31 13:19:28 EST 2002 | dason_c

What is the baking time/temperature standard for the PCBA before BGA rework?

PCBA Production Manufacturing Time Control

Electronics Forum | Fri Apr 15 13:39:43 EDT 2022 | emeto

Bake a board. Measure weight. Measure board weight that haven't been baked.

Pre-bake of Polyimide flex ? ?

Electronics Forum | Wed Dec 22 19:09:17 EST 2004 | rohman23

Very strange...I just logged into the internet to come post this very question for all the lurking experts. We have a 16 layer rigid-flex that we have never baked. Our board vendor is expressing concern that we do not perform a pre-bake before assy

PCBA rework

Electronics Forum | Mon Mar 08 22:04:19 EST 2004 | pari

Dave i know abt the JEDEC033A specs..but this question is more of PCBA level. The baking temp and time at JEDEC is for MSD devices. I have tried to check IPC 7711 but the criteria does not mention the baking temp and time. Wandering is anyone is awar

Drying PCB after contamination measurement for rework ?

Electronics Forum | Wed Mar 02 13:15:16 EST 2022 | chris007

I am currently working on a manufacturing flow where some PCBA are processed with reflow oven (after being baked before processing), then cleaned with bath, then passed into contaminometer, passed into AOI. The point is after all of this, if AOI dete

Cleaning

Electronics Forum | Sat Dec 19 04:51:49 EST 2015 | padawanlinuxero

bake the pcba, continue with the aqueous cleaning but after the cleaning bake them in a circulated oven. we do that with some of our pcbs here we use a water base flux, we clean it and then we bake them for 10 minutes at 190F

vias descoloration

Electronics Forum | Fri May 28 13:19:31 EDT 2021 | cbart

I can't see the image very well, but from what i see it looks like oxidation. looks like an ENIG finish on the board, possibly a plating issue from the bare board house, thin gold or the nickle is to thick. one other question i would get an answer t


baking pcba assy searches for Companies, Equipment, Machines, Suppliers & Information

Equipment Auction - Eagle Comtronics: Low-Use Electronic Assembly & Machining Facility 2019 Europlacer iineo + Placement Machine  Test & Inspection: Agilent | Tektronix | Mantis Machine Shop: Haas VF3 | Haas SL-20 | Mult. Lathes

Software programs for SMT placement and AOI Inspection machines from CAD or Gerber.
Equipment Auction - Eagle Comtronics: Low-Use Electronic Assembly & Machining Facility 2019 Europlacer iineo + Placement Machine  Test & Inspection: Agilent | Tektronix | Mantis Machine Shop: Haas VF3 | Haas SL-20 | Mult. Lathes

World's Best Reflow Oven Customizable for Unique Applications
2024 Eptac IPC Certification Training Schedule

Training online, at your facility, or at one of our worldwide training centers"
IPC Training & Certification - Blackfox

Easily dispense fine pitch components with ±25µm positioning accuracy.