Full Site - : thermal shock (Page 4 of 50)

Lead Free Solders and Embedded Passives Headline Professional Development Schedule at 2003 IPC Annual Meeting

Industry News | 2003-07-08 09:48:46.0

taking place September 28-October 2, at the Minneapolis Convention Center in Minneapolis, Minn.

Association Connecting Electronics Industries (IPC)

IPC Releases schedule of professional development courses

Industry News | 2003-08-27 10:58:00.0

Lead free solders and embedded passives headline professional development schedule at the 2003 IPC Annual Meeting

Association Connecting Electronics Industries (IPC)

IPC Issues Call for Papers for Third Annual IPC High Reliability Forum

Industry News | 2018-08-29 19:35:22.0

IPC — Association Connecting Electronics Industries® invites engineers, researchers, academics, technical experts and industry leaders to submit abstracts for IPC High Reliability Forum to be held May 14–16, 2019 in Hanover (Baltimore), Md.

Association Connecting Electronics Industries (IPC)

IPC Issues Call for Participation for High Reliability Forum

Industry News | 2023-04-17 08:38:56.0

IPC is now accepting abstracts for the High Reliability Forum, the international conference focusing on Class 3 and safety critical electronics for mil-aero, automotive, medical, and long-life applications that are subjected to harsh use environments. The High Reliability Forum will be held October 17-19, 2023, at the Hilton Baltimore BWI Airport in Linthicum (Baltimore), Md.

Association Connecting Electronics Industries (IPC)

IPC Conference on Reliability Highlights New Findings in All Areas of Electronics Assembly

Industry News | 2011-08-24 17:13:21.0

The IPC Conference on Reliability: Assembly Process for a Reliable Product will be held November 1-2, 2011, in Irvine, Calif. The conference will address reliability issues that arise at the assembly level, dedicating half-day programs on new developments in each of three key areas: materials, processes, and test and inspection.

Association Connecting Electronics Industries (IPC)

BGA Thermal Shock Testing

Technical Library | 2007-02-01 09:27:47.0

The purpose of the testing was to compare the resistance and check for open circuit conditions of reworked BGA test samples made with and without StencilQuik™ after 500 thermal shock cycles. StencilQuick™ is a product of Best Inc. In this series of tests, the resistance of daisy chain resistance patterns running between the BGA and test board after exposure to thermal shock was measured.

BEST Inc.

PCB pad repair technique demonstrated using the 2-part epoxy method.

PCB pad repair technique demonstrated using the 2-part epoxy method.

Videos

PCB pad repair technique demonstrated using the 2-part epoxy method. More on this PCB pad repair technique: http://www.solder.net/services/pcb-repair/pad-and-trace-repair/ More on the recommended epoxy: http://www.soldertools.net/pcb-repair-epoxy-r

BEST Inc.

PCB Epoxy Repair Kit

PCB Epoxy Repair Kit

New Equipment | Rework & Repair Equipment

The BEST PCB Epoxy Repair Kit can be used to repair lifted pads and traces as well as build up and repair edge corner damage to PCBs or repair solder mask which has been damaged or removed. By adding colorants a pcb color epoxy kit can be made up cus

BEST Inc.

How to inspect the temperature recovering time of thermal shock chamber?

Technical Library | 2019-11-12 02:09:22.0

Thermal shock test chamber can be used for testing the chemical change or physical damage on composite materials caused by the thermal expansion and contraction of the sample in the shortest time,which is subjected to extremely and continuous high and low temperature environment.so how to check the temperature recovery time of this chamber? Normally we take following steps to inspect the temepratuire recovering time: 1.Install the temperature sensor at the specified position, and adjust the temperature controller of hot zone and cold zone to the required nominal temperature respectively. 2.The temperature increases and reduces respectively,30min after temperature in two zones reach stable status,record temperature value of the measuring point,pls set the temperature value of two zones to be required nominal temperature. 3.The temperature shock test chamber automatically places the inspected load into theh ot zone,select the corresponding retention time according to regulated standard. 4.Set the transfer time,then the inspection load is transferred from hot zone to cold zone, and the temperature of the measuring point is observed and recorded, and then the reverse conversion of the load from cold zone to hot zone is carried out according to the same method, and the temperature of the measuring point is observed and recorded. www.climatechambers.com

Symor Instrument Equipment Co.,Ltd


thermal shock searches for Companies, Equipment, Machines, Suppliers & Information

Equipment Auction - Eagle Comtronics: Low-Use Electronic Assembly & Machining Facility 2019 Europlacer iineo + Placement Machine  Test & Inspection: Agilent | Tektronix | Mantis Machine Shop: Haas VF3 | Haas SL-20 | Mult. Lathes

High Precision Fluid Dispensers
Selective Soldering Nozzles

Wave Soldering 101 Training Course
Equipment Auction - Eagle Comtronics: Low-Use Electronic Assembly & Machining Facility 2019 Europlacer iineo + Placement Machine  Test & Inspection: Agilent | Tektronix | Mantis Machine Shop: Haas VF3 | Haas SL-20 | Mult. Lathes

World's Best Reflow Oven Customizable for Unique Applications
SMT feeders

Component Placement 101 Training Course