Electronics Forum | Fri May 16 11:28:23 EDT 2003 | swagner
In agreeance with the previous postings I would like to add one more thing, in event of a automotive recall a lot of money can be saved by knowing which lot code is bad and tracing the data back to a specific group of vehicles instead of recalling se
Electronics Forum | Sun Mar 11 23:12:35 EDT 2007 | fastek
These guys claimed to have level 6 traceability.....and look where that got them. http://www.sinclairc5.com/
Electronics Forum | Wed Mar 07 12:25:49 EST 2007 | Pete
Looking for a reliable solution to printing and applying bar codes to pc boards for manufacturing processing and traceability
Electronics Forum | Thu Apr 19 07:13:38 EDT 2007 | ffoerster
Hello, I need to convert setup files to an xml-string for Traceability. Therefore I need a description of the fileformat, as it is used internally from the Software.
Electronics Forum | Mon May 18 07:35:15 EDT 2015 | cyber_wolf
Hi Josh, Yes I am aware of what it does. We have it but have not turned it on yet. We are looking at a factory wide solution for traceability. I was just curious as to whether or not anyone has actually deployed the IFS. Thanks for the response
Electronics Forum | Mon Jun 29 06:57:13 EDT 2015 | jlawson
Valor MSS has options for NPI Data preparation and processing, SMT programming, documentation, verification, materials management, traceability, and QA management not just in SMT but into backend process aka manual assembly as well as production plan
Electronics Forum | Thu Sep 08 17:19:42 EDT 2016 | jasltd
Thanks for the reply, unfortunately I need to place the label prior to the placement machine as I need the placement machine to read the barcode of the board as it enters the machine to provide component traceability.
Electronics Forum | Thu Aug 16 00:41:03 EDT 2018 | smt2020
Hey man, can you please suggest what you do for traceability system to count cycles of the stencil. Is there any special setup for that or just a Excel sheet with formulas.?
Electronics Forum | Thu Aug 16 07:56:54 EDT 2018 | cyber_wolf
Never heard of any traceability requirements for stencil cycles. The SPI machine should be the judge of how your print process is performing.
Electronics Forum | Wed Aug 08 13:24:44 EDT 2018 | boyo462
The Company just certified to AS9100. One of the minor observations related to the method used to measure the lead length to insure compliance with IPC requirements. Are there any tools/devices/equipment available to measure lead lengths that is repe