Electronics Forum | Wed Jun 08 13:21:43 EDT 2022 | emeto
The right way will be to use CAD for programming and then compare to BOM.
Electronics Forum | Wed Jun 08 18:45:20 EDT 2022 | emeto
You can use the "Duplicate values in Excel"
Electronics Forum | Mon Mar 13 20:16:39 EST 2000 | Dreamsniper
If an operator loaded a wrong value of component with the same packaging, say 0805, on a feeder slot. how will the program verify this situation? or an operator interchanged 2 0805 capacitors with different values from feeder slot #5 and feeder slot
Electronics Forum | Mon Mar 13 20:16:39 EST 2000 | Dreamsniper
If an operator loaded a wrong value of component with the same packaging, say 0805, on a feeder slot. how will the program verify this situation? or an operator interchanged 2 0805 capacitors with different values from feeder slot #5 and feeder slot
Electronics Forum | Thu Mar 29 13:06:07 EST 2001 | billschreiber
Hello again Mike, First, I apologize to the people that have been put through this exercise. However, I cannot let you continue to misrepresent my company. Your continued attempt to cloud this issue by referring solely to the U.S. EPA�s Verificati
Electronics Forum | Tue Apr 07 09:35:29 EDT 1998 | Chris Jackson
I am looking for suppliers of SMT setup verification systems that use bar code lables as the medium. I have located Brady and Unicam's verifeed. We have immediate need due to the push to remove component markings. We have two lines presently: Panason
Electronics Forum | Wed Mar 14 21:57:58 EDT 2007 | Dave Jurena
We are setting up a facility in China and would like to verify the resistivity reading on our Westek wash machine. The only tool we have at this time is a multimeter. The machine reads .570 Mohms and the MM reads around .25 Mohms at a probe distance
Electronics Forum | Wed Jul 18 11:49:59 EDT 2007 | davef
The auditor may be using "verify" in an ESD Program context. See ANSI/ESD S20.20 [1999], 6.1.3, Compliance Verification Plan. It gives one definition of what the auditor may be seeking. For more on verification programs, look here: http://www.protek
Electronics Forum | Wed Jun 08 03:09:44 EDT 2022 | pradeep14
Thank you. In our organization also we are following loading verification before starting the placement. But i want know before starting the placement during NPI/Proto Build, what are the system need to be followed to cross check with Pick & Place pr
Electronics Forum | Fri Feb 10 11:33:32 EST 2006 | fredericksr
I am putting together an internal oven calibration procedure. I am interested in how stringent your oven calibration process is. Really what I am putting out is a verification process and a calibration process for the event that verification should