Quad 4C laser align calibration

Electronics Forum | Wed May 25 22:32:28 EDT 2016 | stevedc

So, I haven't used my Quad 4C for a while and when I started everything back up to run a new board it appears that the Quad align is in need of calibration. When I pick up a component and do an LAE measurement on it it shows the part center location

Board Handling Error: Waiting for output board transfer to complete, on GSM1 4681A UIC

Electronics Forum | Thu Jul 28 15:43:48 EDT 2016 | ddina

Recently started setting up our GSM 4681A system, and one of the machines comes up with the message "WAITING FOR OUTPUT BOARD TRANSFER TO COMPLETE" after the Zeroing process has been started. Machine has all the defaults set, two SMEMA connected univ

Grid-Lok Leaking

Electronics Forum | Tue Sep 13 19:06:49 EDT 2016 | dontfeedphils

Well I've tried to get in touch with Ovation for weeks now without luck, so maybe someone here will have the answers I'm looking for. One of our Grid-Lok Gold modules is leaking air from the sides (it pushes the pins up fine, but when air is applied

BTU VIP70 help

Electronics Forum | Fri Oct 28 13:58:57 EDT 2016 | ttheis

Hi everyone, We just picked up an old VIP70 oven and it is in need of more maintenance than we were told when we bought it so I'm working on a few issues. The main thing right now is linking the FCU controller to the PC. I've tried using both seria

Pick and Place Machines (Blue Book)

Electronics Forum | Tue Nov 01 11:57:19 EDT 2016 | spoiltforchoice

I don't know how accurate an idea you will get on eBay. Here in the UK the only stuff that ends up on eBay is total crap, manufacturers and brokers between them seem to get hold of most of the machines when they come to the end of their lease or usef

Pick & Place cycle

Electronics Forum | Mon Nov 07 10:33:48 EST 2016 | huske

Which process do you have a question about? Is there something more specific you're looking for? Basically you're close on the cycle. And this is a very basic cycle, there are many types of nozzles,machines,methods that will do this slightly differe

Electronic Components Distributors

Electronics Forum | Tue Nov 15 07:40:13 EST 2016 | robl

1) Look at who is actually franchised to sell the manufacturer in your region, cross check with MFG website. You can buy non-franchised, but if something goes wrong don't expect the local guys to help. 2) Do your engineers/customers need technical s

Shoot Up Reflow Zone

Electronics Forum | Thu Dec 08 13:34:46 EST 2016 | spitkis2

We are currently experiencing with our SMD Solder > Reflow Equipment on Shooting-Up Zones (Zones > 3,4,5,7 & even Cooling Zone). PV exceeds about > 5-10 degrees with the SP. (ex: SP=140deg, actual > PV = 145deg & higher). Our equipment undergo a

SMT line cable management

Electronics Forum | Tue Feb 07 10:18:34 EST 2017 | swag

Our entire shop floor has a hanging uni-strut grid ceiling approx. 10 feet up. The actual ceiling of the building is probably 16 ft. max ceiling with pitch. We run all air lines and power on it. The uni-strut is hung by all-thread rods. Sounds co

Waves soldering: not enough solder remaining on pads

Electronics Forum | Mon May 22 14:31:58 EDT 2017 | sumote

I agree. Trim the leads before insertion, then raise the pot height. With the information given, this is most likely your solution. Our machine has a dam wall on the rear of the solder pot that raises the height on the solder pool. I would make sure


ups searches for Companies, Equipment, Machines, Suppliers & Information

High Throughput Reflow Oven

Nozzles, Feeders, Spare Parts - Siemens, Fuji, Juki, Yamaha, etc...
Blackfox IPC Training & Certification

Easily dispense fine pitch components with ±25µm positioning accuracy.
Pillarhouse USA for handload Selective Soldering Needs

High Throughput Reflow Oven
Electronics Equipment Consignment