Electronics Forum: (4) (Page 495 of 664)

Quad IVc AutoProgram

Electronics Forum | Wed Apr 10 15:05:23 EDT 2013 | microaide

I followed your instructions and did NOT select the option to break up the program for separate central controllers. I now have a program I can copy to central controller #1, and I can delete the head 2 data from the program. Now when I select RUN TH

2 oz Copper thickness??

Electronics Forum | Tue Apr 23 15:18:02 EDT 2013 | davef

2 oz copper should be 2 oz per ft^2 thick. There is no relationship between thickness and copper weight due to the effect of processing. Since this is a painful way of thinking about things, ppl have reached a compromise and talk about 'nominal thick

assembly software for JUKI

Electronics Forum | Wed Jul 03 09:13:23 EDT 2013 | dontfeedphils

I currently run the HLC software suite with a 750/760 line and another 2060 line. For the 750/760 line I have to stick with the older HLC, version 4.5 I believe, which I actually run inside of a Windows 98 virtual PC using a dongle emulator. The 20

H49s crystals been placed

Electronics Forum | Tue Jul 30 15:04:54 EDT 2013 | ericrr

Is it just possible that H49s crysats are hard to place, so it looks like it has been place by a perfectionistic instead of looked like it had a parachute type loading. This is the H49 short stubby type crystal about 10 mm long (width) about 4.5 mm

Communication problem

Electronics Forum | Thu Aug 29 11:56:21 EDT 2013 | kdc45

Sent program to a CP43 and the part data was not recognized. Machine message to power down and back up, so we did so. On power up, screen appeared with the following: OS Error Err Code 0001 Err task 0028 Err para FFFF Ex stat 0151 Err adrs CC400000

QUAD 4C Laser problem

Electronics Forum | Thu Sep 12 20:42:16 EDT 2013 | marcelorotofrance

Jorge: Nosotros tenemos una óptica 0KM embalada perteneciente a Martín. Se la dio a Bruno cuando palmó la nuestra, sin embargo el equipo nuestro tiene el otro modelo. Si querés pasala a buscar y la probás. Estoy seguro que es la solución al problema,

Problems Using Parts From Broker

Electronics Forum | Mon Sep 09 12:00:01 EDT 2013 | proteus

I have a 208 pin QFP that due to manufacture obsolescence I have to get them form the broker market. I've had several issues with the parts including; bent leads, leads that don't take solder very well, co-planarity problems, and DOA fallout after a

through hole today

Electronics Forum | Wed Sep 11 20:36:04 EDT 2013 | action_101

UIC still manufacturers new thru-hole machines. Both axial and radial insertion models are available. They stopped making the multi-mod dip inserters in '91 or '92. And parts are easily acquired for any older models, there were a ton of machines out

Personnel

Electronics Forum | Sat Sep 14 23:45:44 EDT 2013 | jandon

How many operator/technician/engineer do you recommend for following SMT assembly line to achieve good uptime and smoothly running quality inspection, NPI process, tehcnical support and maintenance at the same time: - Single shift, 8 hours/day - Pri

Pick and place machine for small productions. Any suggestions?

Electronics Forum | Fri Jan 10 00:52:46 EST 2014 | mmdashti

Dear Madam/Sir; 1)Unfortunately after some installations and commissioning SMT and THT machines from Beijing Torch (Termway) company in Iran , the quality and operation of these machines seems so so... bad in quality. Because we have some advertise


(4) searches for Companies, Equipment, Machines, Suppliers & Information

2024 Eptac IPC Certification Training Schedule

World's Best Reflow Oven Customizable for Unique Applications
Electronics Equipment Consignment

High Throughput Reflow Oven
SMT feeders

Training online, at your facility, or at one of our worldwide training centers"
Assembly Automation Technology

"回流焊炉"