Electronics Forum: board (Page 794 of 1638)

Re: First Article

Electronics Forum | Thu Oct 07 04:46:03 EDT 1999 | Wolfgang Busko

| Our first article inspection after machine placement can take several hours depending on the complexity of the board. The operator visually checks the board against the drawing and bill of material. I'd be interested to hear if there are any other

PCB Support Methods @ the Fuji.

Electronics Forum | Wed Sep 22 16:48:40 EDT 1999 | C.K.

Question for you SMT guru's out there. What is the best way to support boards on Fuji's CP6 machine's x-y table...particularly for 2nd side SMT where the support side already has parts... I am toying around with the following methods: 1.) Custom b

Re: PCB Support Methods @ the Fuji.

Electronics Forum | Wed Sep 22 16:51:05 EDT 1999 | C.K.

| Question for you SMT guru's out there. | | What is the best way to support boards on Fuji's CP6 machine's x-y table...particularly for 2nd side SMT where the support side already has parts... I am toying around with the following methods: | | 1.

Re: PCB Support Methods @ the Fuji.

Electronics Forum | Thu Sep 23 10:20:58 EDT 1999 | Earl Moon

| Question for you SMT guru's out there. | | What is the best way to support boards on Fuji's CP6 machine's x-y table...particularly for 2nd side SMT where the support side already has parts... I am toying around with the following methods: | | 1.

Re: Turnkey vendor needed

Electronics Forum | Wed Sep 22 22:47:38 EDT 1999 | Dave F

| Corvis has requirements for pc manufacture, parts procurement, and board assembly. This is to include boards of up to 10-12 layers, and down to 0603 SM components. If all of these are what you do, please contact me at: | | Corvis | Howard Levequ

Re: Metal Inspection Templates

Electronics Forum | Tue Sep 21 13:25:18 EDT 1999 | Dave F

| | | I like to see if anyone has any info or experinces with metal inspection templates in a post oven process. | | | My problem issue is the ESD, since they are metal(12 mil stencil material). I welcome any comment. | | | | | | Thank you. | | | |

Re: Metal Inspection Templates

Electronics Forum | Tue Sep 21 15:31:05 EDT 1999 | Hugh Martin

| | | | I like to see if anyone has any info or experinces with metal inspection templates in a post oven process. | | | | My problem issue is the ESD, since they are metal(12 mil stencil material). I welcome any comment. | | | | | | | | Thank you.

Re: Solder Shorts Under SMT Resistors/Capacitors

Electronics Forum | Wed Sep 22 22:32:40 EDT 1999 | Dave F

| We are finding solder shorts under 1206 Components on the bottom side of our boards.In all cases these shorts are from either side of the component to a feed-thru under the component body. Adhesive is used to glue down the component and then the bo

Re: Masking of connectors

Electronics Forum | Thu Sep 16 20:45:51 EDT 1999 | Dave F

| We have a new custumer that needs thier thru-hole/smt boards conformally coated. We currently do not have a selective spraycoating system adn this low volume of these board do notwarrant a 100k machine. We are spending way to much time masking and

Re: De-panel

Electronics Forum | Thu Sep 16 09:29:13 EDT 1999 | Rob Jankowski

| | | Looking for a manual machine to de-panel with the panels held by 60mm tabs. Each panel hold multi-boards consisting of different shapes and sizes. Scoring is apparently not an option and volume does not dictate a large scale machine. | | | |


board searches for Companies, Equipment, Machines, Suppliers & Information

2024 Eptac IPC Certification Training Schedule

Training online, at your facility, or at one of our worldwide training centers"
SMT feeders

Nozzles, Feeders, Spare Parts - Siemens, Fuji, Juki, Yamaha, etc...
Selective soldering solutions with Jade soldering machine

Have you found a solution to REDUCE DISPENSE REWORK? Your answer is here.


Training online, at your facility, or at one of our worldwide training centers"