Planned maintenance is: * Scheduled based on the equipment supplier recommendations. These maintenance schedules may be modified based on clear-headed thinking that is documented. * Calibration may not be slipped, but the schedule may be moved up. [Most of this work is done all at once between Christmas and New Year, during the physical, by an outside service firm.] * Non-calibration may be slipped, but the slip must less than a defined maximum period.
Planned maintenance is scheduled by the MRP. The MRP issues job orders for maintenance, just like a customer order. The job order states the job requirements, inspection requirements, etc. Operators, or whoever, complete the job order is retained in a machine file. Manufacturing engineering reviews and then files the completed job order in a machine file.
Additionally, operators, or whoever, record �everything� they do on a machine in a maintenance log. Manufacturing engineering reviews the maintenance log.