ENTEK C6688 IRD
Company Information:
Name: |
ENTEK C6688 IRD |
Category: |
|
Offered by: |
|
ENTEK C6688 IRD Description:
Sales Manager: Nancy Lin
Email: info@amikon.cn
Skype: onlywnn_1
Mobile(Whatsapp): (+86)-18020776786
Amikon :
Shipping Term : TNT,DHL,FEDEX,ETC
Payment Term : T/T
Warranty: 12 month
Amikon supply: New+original+factory sealed+high quality
Service: quotation will be sent in 9 hours
Skype + whatsapp + mobile = 24 hours /day Oneline.
1.Q:What about your shipping terms ?
A: We can ship by DHL,UPS,FEDEX,ARAMAX,TNT,and so on
2.We're in this field more than 12 years. If there's any problem, please contact with us,we'll provide suggestion from our engineer to help you solve problem.
3.Q:How long warranty does Amikon can provide ?
A: Amikon can provide 1 year warranty !
Our services
Packing & Delivery
1)100% full New! - Original Factory Seal !
2)Warranty: 12 months!
3)Package: Original packing with cartons.
4)Delivery time: Shipped in 3 days after payment
Best Quality Assurance:
1. We only provide the original new items, 100% make sure the best quality!
2.1 year warranty GUARANTEE OF QUALITY (After Our Delivery Date).
ENTEK C6688 IRD
ENTEK C6688 IRD
ENTEK C6688 IRD
Fuel Heating
Most of the combined cycle turbine installations
are designed for maximum efficiency. These
plants often utilize integrated fuel gas heaters.
Heated fuel results in higher turbine efficiency
due to the reduced fuel flow required to raise
the total gas temperature to firing temperature.
Fuel heating will result in slightly lower gas turbine
output because of the incremental volume
flow decrease. The source of heat for the fuel
typically is the IP feedwater. Since use of this
energy in the gas turbine fuel heating system is
thermodynamically advantageous, the combined
cycle efficiency is improved by approximately
0.6%.
Diluent Injection
Since the early 1970s, GE has used water or
steam injection for NOx control to meet applicable
state and federal regulations. This is
accomplished by admitting water or steam in
the cap area or “head-end” of the combustion
liner. Each machine and combustor configuration
has limits on water or steam injection levels
to protect the combustion system and turbine
section. Depending on the amount of water or
steam injection needed to achieve the desired
NOx level, output will increase because of the
additional mass flow. Figure 14 shows the effect
of steam injection on output and heat rate for
an MS7001EA. These curves assume that steam
is free to the gas turbine cycle, therefore heat
rate improves. Since it takes more fuel to raise
water to combustor conditions than steam,
water injection does not provide an improvement
in heat rate.
Air Extraction
In some gas turbine applications, it may be
desirable to extract air from the compressor.
Generally, up to 5% of the compressor airflow
can be extracted from the compressor discharge
casing without modification to casings
or on-base piping. Pressure and air temperature
will depend on the type of machine and site
conditions. Air extraction between 6% and 20%
may be possible, depending on the machine
and combustor configuration, with some modifications
to the casings, piping and controls.
Such applications need to be reviewed on a
case-by-case basis. Air extractions above 20%
will require extensive modification to the turbine
casing and unit configuration.
DRESSER 3/4" VALVE 19126FCF-2-CC-MS-33-SW-SW-IA
DRESSER 3/4" VALVE 19126HCO-1-CC-DA-33-SW-SW-I-A
Allen Bradley PowerFlex 70 20AD014A
NK TECHNOLOGIES KW2012V KW2000
GENERAL ELECTRIC IC3600KMVB2 RELAY BOARD IC3600
INDRAMAT CONTROL BOARD PCU04.2D-16E-50C-AA-GL/CLT01.2C
OMRON C120-LK201-EV1 3G2A6-LK201-EV1 LK201 RS232C
SQUARE D POWER LOGIC ETHERNET 3050EGW2 63230-210-100
IRON MAN W8260220.00 BMQ826-15-180-L RATION 15:1 1-1/8"
GENERAL ELECTRIC F31X170TBSAAG1 531X170TBSABG1
SICK OPTIC ELECTRONIC AGSE 300-1211 293 mm, 6m
BAILEY CONTROLS NDS002 DIGITAL OUTPUT 6636038A2
HONEYWELL DC200H-0-000-1F0000-0 UDC2000
ROSEMOUNT 0444LL1U1A1E5 0-150F .8-3.2VDC
NEW ABB ELEC. TRANSMITTER 503TB01261A0120-1000-804216
YOKOGAWA SC402G-E-1-E 110-120VAC 50/60Hz EXA SC402
WITTENSTEIN S-10001100-F LPK 050-M03-50-111 DMF 15/10
Schrader Bellows PAG122301 30.500
Honeywell Excel R7511A1012
SANYO DENKI CIRCUIT BOARD CARD PDT-093-20
GE BHA PRECIPTECH POWER GUARD VOLATAGE CONTROL SQ-300 48700300-002
Scrap GOLD (8) IC's IC Reclam Gold NCR 8330 2401-03
Baldor Grinder F002838 1/3hp 3 phase 460V 3000/3600rpm
Fanuc Devicenet I/F PCB A16B-2203-0190/03A
MTS 515743-01B Load Unit Control 490.05C
Omron Interactive Display NT631C-ST152B-EV2 NT631CST152BEV2 24vdc ASIS
GENERAL ELECTRIC F31X111PSHAEG1 MFC/POWER SUPPLY CARD
RCA COLOR RADAR Avionics Aviation
ABB Analog Output, YT204001-AA/1 YPM102A, YPM 102A, YT204001-AA,
ARO Grease Pump, Drum Barrel Pump,
ALLEN-BRADLEY CIRCUIT BOARD A70300
Felco SWISS C16 Electrical
ABB OPTION BOARD CURRENT OUTPUT, YM222001-TB, SE0109D283, PFAK 111
Omron Interactive Display NT631C-ST152B-EV2
TAYLOR 58S402 886001
Bailey Controls Infi 90 Multi Function Processor IMMPI01 5Vdc
GE 7700 Series Size 3 Motor Control With CR206E0 601C842 G1 75C251686-1-A3
BALLUFF BTL6-A500-M0150-PF-S115 BTL0P8P
FOSTORIA INDUSTRIES F2548H 2500W
GENERAL ELECTRIC 531X133PRUAGG1 F31X133PRUAGG1
CARLISLE R5VX1060-3
LINK BELT / REXNORD MU5315UM 12TY1519
HUB CITY 214 Gear Box Speed Reducer ratio 20:1 0220-61204-214
Fisher DPR900X1-A5 DPR900
TOYODA SANYO MC1K-U030
SUMITOMO CNHJ-6100Y-21 CNJ6100Y21 21:1 RATIO 2.59HP
Dodge Tigear 2 Gear Box Speed Reducer 13Q10L56 Ratio 10:1 .85hp
Dodge Tigear 2 Gear Box Speed Reducer 13Q20L56 Ratio 20:1 .53hp
TOLOMATIC 02770000
TOSHIBA 41532H
GE CIRCUIT BOARD IS200AVGBG1AAA 6BA01
ENTEK C6688 IRD was added in Jun 2018
ENTEK C6688 IRD has been viewed 460 times
20 More Products from Amikon Automation Equipment Co., LTD :