Industry Directory | Consultant / Service Provider / Equipment Dealer / Broker / Auctions / Manufacturer's Representative / Training Provider
Products, services, training & consulting for the assembly, rework & repair of electronic assemblies. BGA process experts. Manufacturers Rep, Distributor & Service Provider for Seamark/Zhuomao and Shuttle Star BGA Rework Stations.
Industry Directory | Manufacturer
Ball Grid Array IC Reconditioning, Re-Ball Service, BGA IC Purchase and Resale
New Equipment | Rework & Repair Services
BGA Rework Services Offered BGA Remove and Placement Level Three Pad Repair Wire Add Trace Repair BGA Re-Balling BGA Inspection We Rework PBGA (Plastic Ball Grid Array) TBGA (Tape Ball Grid Array) uBGA (Micro BGA) CCGA (Ceramic Colum
New Equipment | Rework & Repair Equipment
The BEST EZReball™ process is the answer to your reballing problems. This BGA reballing process simplifies the process while eliminating the clean up of all those paper remnants, allowing for better yields and faster reballing times. The simplicity o
Electronics Forum | Mon Jan 12 20:43:39 EST 2004 | Al
who has the step by step how to reball a Ceramic BGA this is a CBGA 50 mil pitch 29 by 29 mm size
Electronics Forum | Mon Jan 12 23:50:08 EST 2004 | Dean
High temp balls (spheres for you PC types) They are non-eutectic balls. Do you have a reballer or stencil setup? If one device...may not be cost effective, but if many you can usually send back the the IC house for re-ball. There are only a handf
Industry News | 2003-03-11 08:16:17.0
Lightspeed has already shipped its first product, and has set up production in a new building with up to date facilities and equipment.
Industry News | 2011-05-17 11:04:30.0
High Yield BGA Reballing Simplified
Parts & Supplies | Repair/Rework
main features The full-automatic BGA Ball Mounting machine PG-FA6800 is composed of IPC control system, high-speed 12 axis motion control system, high definition Vision inspection system, convenient operation system, and automatic orientation contr
Parts & Supplies | Repair/Rework
main features The full-automatic BGA Ball Mounting machine PG-FA6800 is composed of IPC control system, high-speed 12 axis motion control system, high definition Vision inspection system, convenient operation system, and automatic orientation contr
Technical Library | 2019-05-30 10:59:13.0
In the current economic environment, the ability to reuse ball grid array(BGA) components that have failed due to solder defects may be an efficient way for electronics manufacturers to reduce costs. Cost may not be the only driving factor in the decision to engage in this recycling practice. The increasing demands placed upon the complexity of microprocessors and integrated circuits (ICs) has decreased the availability of some components, and increased their lead time. Because of this, reballing may provide a means to meet schedule, reduce rework turn-around time, and give a manufacturer a decisive advantage over other companies in an ever increasingly competitive market. This article will discuss the process of reballing BGA components (Figure 1), examining preparation (the preform method, the screen method), and cleaning and bake-out.
Technical Library | 2013-07-11 15:22:40.0
This research paper will focus on the effect of various parameters that are used to reball a BGA and their effect on the overall shear strength. Factors that will be looked at include the type of BGA (SAC305 or 63Sn/37Pb), the alloy used to reball (SAC405 or 63Sn/37Pb), the type of flux used (Water Soluble or No Clean), and the environment in which reballing takes place (Nitrogen or Ambient).
Demo on how to reball a BGA component using a universal reball fixture.
Live Demo of the SRT Sierra 1000 BGA Rework Station. Tune in, watch, learn and ask questions about BGA Rework Stations, BGA Rework Services, BGA Reballing and more! http://www.pcb-repair.com/bga-rework-station/
Training Courses | | | PCB Rework and Hand Soldering Courses
The PCB rework and hand soldering courses courses cover techniques of rework and repair of PCBs, BGAs and other electronics assemblies, and teach fundamentals of soldering of electronics assemblies.
Training Courses | | | PCB Rework and Hand Soldering Courses
The PCB rework and hand soldering courses courses cover techniques of rework and repair of PCBs, BGAs and other electronics assemblies, and teach fundamentals of soldering of electronics assemblies.
Events Calendar | Tue Feb 19 00:00:00 EST 2019 - Tue Feb 19 00:00:00 EST 2019 | ,
Webinar: BGA Reballing - Theory and Hands On
Events Calendar | Mon May 04 00:00:00 EDT 2020 - Mon May 04 00:00:00 EDT 2020 | ,
Ball Grid Array Rework - How to Do It Successfully
Career Center | Fremont, California USA | Engineering,Production
4 years of PCB assembly process.
Career Center | garaden grove, California USA | Engineering,Management,Production,Quality Control,Technical Support
11 years experience in SMT process.
Reliability of BGA Solder Joints after Re-Balling Process SMTnet Express October 4, 2012, Subscribers: 25550, Members: Companies: 9004, Users: 33746 Reliability of BGA Solder Joints after Re-Balling Process First published in the 2012 IPC APEX EXPO
Products, services, training & consulting for the assembly, rework & repair of electronic assemblies. BGA process experts. Manufacturers Rep, Distributor & Service Provider for Seamark/Zhuomao and Shuttle Star BGA Rework Stations.
Training Provider / Manufacturer's Representative / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
1750 Mitchell Ave.
Oroville, CA USA
Phone: (888) 406-2830