Project Control supports multi-level job shops contract manufacturers U.S. government contractors and engineer-to-order concerns with their need to manage operations by project Work Breakdown Structure designed to meet the cost reporting requirements
Electronics Forum | Mon Jun 14 08:14:01 EDT 2004 | Arvind
For each job we create a standard BOM spreadsheet. Our problem is that for every RFQ we have to get price and availability check for each part even though many parts are used in other BOM and this information exist in other spreadsheets. I was wonder
Electronics Forum | Thu Aug 27 23:51:10 EDT 2009 | leadthree
I have a little problem. We are assembly subcontractor and we purchase most parts ourselves. Currently we have all BOM/Partlists in an Excel format. We get a few RFQ each month, prices come from well known original sources, Mouser, Digikey etc. and
Industry News | 2017-01-29 22:30:11.0
CalcuQuote announces a new Bid Sheet Portal, allowing electronics contract manufacturers to send, and component distributors to receive, Bill of Material (BOM) bid sheets in a single, easy-to-use interface. The new platform, called BidCQ, gives distributors bid sheets detailing part manufacturers, manufacturer’s part number, and a product description, as well as access to line-item attachments. Distributors can respond to customer requests for quote (RFQ) with their on-hand inventory or lead time, price information across quoted quantities, minimum quantity buys, quantity multiples, suggested alternate parts, and other information.
Industry News | 2022-09-26 06:58:30.0
CalcuQuote received a 2022 Mexico Technology Award in the category of Software – Component Management for its QuoteCQ RFQ Management Software. The award was announced during a ceremony that took place Wednesday, Sept. 21, 2022 during SMTA Guadalajara in Mexico.
Career Center | , Pennsylvania USA | Engineering,Production,Quality Control,Research and Development
SKILLS Quote preparation for RFQ projects. Exposure to IPC A 610 and IPC A 600. Knowledge of Potential Failure Mode Effect Analysis (PFMEA), Process control plan (PCP) for new products, based on the Critical to Quality (CTQs). Knowledge in handli
Career Center | Theni, Tamilnadu India | Engineering
NPI Engineer: • Playing a role as NPI leader of the Telecom, Aerospace & Server Products to introduce and run to qualify the engineering build from customer. • Conducting Weekly NPI meeting with the CFT team to review the progress of the NPI schedu