Electronics Forum | Fri Oct 12 11:18:57 EDT 2012 | srgbarba
Hi, I want to ask if someone saw the combo process at smt lines for panel array (bot & top per both sides), I just perform some experiments and it works perfectly, and I validate the T hus (Cg/Pa) and no one component were dropped after the 2nd reflo
Heller 公司 | http://hellerindustries.com.cn/00600-248.pdf
component’s candidacy for bottom-side attachment:2 Cg/Pa Where C = component’s weight in grams; P = total pad area in square inches (g/in2 must be ≤ 30 for second-side mount
Heller Industries Inc. | https://hellerindustries.com/wp-content/uploads/2018/07/00600-248.pdf
component’s candidacy for bottom-side attachment:2 Cg/Pa Where C = component’s weight in grams; P = total pad area in square inches (g/in2 must be ≤ 30 for second-side mount