SMT Express, Issue No. 2 - from SMTnet.com Volume 1, Issue No. 2 Wednesday, July 14, 1999 Featured Article Continued From Previous Page PRINTED CIRCUIT BOARD FABRICATION BASICS AN OUTLINE Earl Moon Proof Of Design (POD) 8. PLATING (AND
GPD Global | https://www.gpd-global.com/pdf/doc/Dispense-System-Service-Guide-22290008G.pdf
machine may need to be leveled both before and after the tie down procedure. If tie down clamps are NOT required, skip to Level Machine. 1. Prepare floor as needed using Spacing & Locations (pg 7.11). 2. Verify a minimum of 30 mm of the foot screw thread is