Electronics Forum | Wed Sep 01 16:33:33 EDT 2010 | smellew
Mike, I don't know this loader, but if you link 3&4 locally on the downstream conveyor, this should make it request PCB from loader via 1 & 2 PCB should then unload.
Electronics Forum | Thu Sep 02 20:41:03 EDT 2010 | mmccance
SME, Thanks for your response, but I have already checked out 1 & 2 on the downstream conveyor, and they are sending the machine ready signal. I know that the loader is recieving it because when the downstream conveyor is not busy the loader attemp
Used SMT Equipment | Soldering - Reflow
Multiple Vitronics XPM Reflow Ovens Available AUCTION ITEMS: Please see our site for details Also available in same auction: YJ Link Loader MPM UP3000, S/N U0908 Conveyor Universal 4688A GSMII, Communications issue please inspect Conveyo
Used SMT Equipment | Pick and Place/Feeders
Universal Genesis, GC-60 - Year 2014 AUCTION ITEM Please see ourt site for additional detail. Also inclued in same auction: YJ Link Loader MPM UP3000, S/N U0908 Conveyor Universal 4688A GSMII, Communications issue please inspect Convey