Electronics Forum | sandima |
Fri Feb 10 05:35:49 EST 2023
Electronics Forum | Tue Feb 07 11:40:55 EST 2023 | tommy_magyar
To me it looks like grounding.
Industry News | 2012-03-29 12:06:03.0
Precision PCB Services, Inc. to provides sales, service, support and training for the Shuttle Star Line of BGA Rework Equipment.
Industry News | 2013-02-05 14:13:33.0
BGA Rework System Demo Tour
Technical Library | 1999-05-07 09:58:23.0
From the point of view of an operating system, a computer is managed and optimized in terms of the application programming model and the management of system resources. For the TFLOPS system, the problem is to manage and optimize large scale parallelism. This paper looks at the management in terms of three key topics: memory management, communication, and input/output.
| http://etasmt.com:9060/te_news_industry/2021-08-31/23964.chtml
. Cool solder -- peak temperature is too low or time too short The peak temperature should be 20~25°C higher than the solder liquid point and remains there for 30~90 seconds. Cooling zone (below 217~220°C after reflow
Surface Mount Technology Association (SMTA) | https://www.smta.org/
. For the most updated information about SMTA events, check our website or contact your local chapter. Get Details Members: Vote For Your New Directors Ballot closes July 1, 2020 Three positions on the SMTA Board of Directors will be filled for the term 2020-2023
A global industrial auction and valuation business with extensive experience in SMT, PCB Assembly & Manufacturing, Test, Semiconductor and other Electronics Machinery & Equipment.
Manufacturer / Equipment Dealer / Broker / Auctions
896 Main Street
Branford, CT USA
Phone: 203-488-7020