Electronics Forum | Wed Mar 04 09:07:01 EST 2015 | edmaya33
Hi All; Anybody here have experience in AVR80 BA DS65 CC process? I have an issue with the curing process at 28 degC RT. Can somebody recommend how to accelarate the curing without IR oven? thanks
Electronics Forum | Wed Mar 04 10:23:03 EST 2015 | rgduval
I haven't used this particular CC, but...found this in their data sheet: "AVR 80 BA Conformal Coating will be touch dry after 15 - 20 minutes at room temperature and does not require a thermal cure. The full properties of the coating will be obtaine
Electronics Forum | Wed Mar 04 10:59:24 EST 2015 | jpierre
Hi first DS65 version is a specific dilution for dispensing machine, in this case the typical process is following: application of the conformal coating extraction of solvent (low extraction power is better)2minutes and drying the drying can be done
Electronics Forum | Thu Sep 20 03:31:42 EDT 2018 | minhhaioh34
Hi all, I need some pro help me with issue bubbles after coating. some information for some pro: Machine: Asymtek Chemical: Achime AVR80 Oven: IA 4 zoon4 ( setting 100 100 90 80 conveyor speed: 0.6 m/min). I had happened before and after the oven. W
1 |