Electronics Forum | Thu Aug 15 15:44:46 EDT 2002 | dragonslayr
You can't control what you don't measure. You have provided very little detail other than post reflow costs are high. What defects are attributed to problems experienced prior to reflow? Are these random or recurring defects? You will need to put ea
Electronics Forum | Wed Jun 23 12:22:11 EDT 1999 | John Martell
Thanks, that makes sense. | | I was wondering if anybody could give an estimated cost of equipment maintenance per year for a complete SMT line for | | a medium volume facility? | | | Equipment maintenance falls distinctly into two categories. | 1.
Electronics Forum | Tue Jun 22 20:41:47 EDT 1999 | Dean
| I was wondering if anybody could give an estimated cost of equipment maintenance per year for a complete SMT line for | a medium volume facility? | Equipment maintenance falls distinctly into two categories. 1. Preventative maintenance. 2. Fail
Electronics Forum | Tue Jul 17 08:10:30 EDT 2007 | rons
I'm looking for some info on contract manufacturing prices. What is a ball park price per SMT placement? I figure there would be two types: Placement A (easy, 0402 and up) and Placement B (0201 and lower and BGA).
Electronics Forum | Mon Apr 04 03:08:42 EDT 2005 | Grant
Hi, I have always wondered how contract SMT assemblers work out the cost to build products. Do they calculate machine time, or cost per placement etc? Regards, Grant
Electronics Forum | Mon Jul 23 18:59:29 EDT 2007 | rons
I found a website that will let you quote your part online. Enter in board info and it calculates a price. They have it at .35 per SMT placement. That sounds very high.
Electronics Forum | Thu Mar 21 16:50:10 EDT 2019 | emeto
Hello, I've done it before in Excel and it is a very simple concept. Inputs are board size, numbers of SMT and TH process sides, number of SMT and TH placements per side, boards per panel and quantity of boards to be produced. Output will be calcul
Electronics Forum | Thu Nov 30 14:32:07 EST 2000 | Claude_Couture
Production of 50000, is this per year, per month, per week, what? As for your budget of 80000 Euro, that is no much to go on. For a basic SMT line, you need at least 1 paste printer, 1 placement machine and 1 reflow oven. If you have any through-hole
Electronics Forum | Tue Jul 17 09:58:18 EDT 2007 | rgduval
I'd say it all depends on the CM, and how they cost out their production floor. I've seen everything from a flat cost per component placement (something like .05/machine placed smt part, .15/machine placed tht part, .25/hand placed tht part) to stra
Electronics Forum | Mon May 07 12:26:35 EDT 2007 | bkgsmtnet
When you say "paying price" are you referring to turnkey costs only OR are you saying that if a smt 0805 cap costs you .08 in labor + actual price you charge .08*2.3=.184 cents per placement? OR the former turnkey question of say it costs you 3 dolla
Main Products: 1. Original new and Original Used SMT/AI Spare Parts. 2. SMT Equipments And Related Machine( SMT Calibration, SMT Feeder Carts,Conveyer etc.) 3. Maintenace and Repair Service Pre-Sales Service Provide details ab
Manufacturer's Representative / Manufacturer / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
3 Road Xintang, Fuhai Street,Fuyong
Shenzhen, 30 China
Phone: 13713862102