Electronics Forum | Mon Mar 30 01:53:15 EDT 2020 | franknguyen
Hi, I have 2k test points need to test by Flying Probe. How can I assume the test cycle time for this? (I use Takaya Flying Probe)
Electronics Forum | Mon Mar 30 04:14:00 EDT 2020 | tbora
I am not sure, but maybe you can see from the monitor of the machine. Doesn't it give to you cycle time ?
Electronics Forum | Sun Apr 07 18:21:08 EDT 2002 | murt
Hi I am a collage student and I was wondering if anyone could explain to me how you would estimate the trough-put, product and cycle time for a double-sided mixed technology pcb assembly. I would be grateful for any information Thanks Martin.
Electronics Forum | Mon Apr 08 20:43:58 EDT 2002 | davef
Regardless of the design technology of the board, we use shop floor management software that: * Calculates the period that it takes to assemble a job. Obviously, we enter product-manufacturing information [ie, BOM, material receipt dates, process fl
Electronics Forum | Mon Dec 24 19:12:06 EST 2007 | adamben10
I'm shadowing an old posting posted by Odor back in March 2002. Any Expert out there, if you have good answer to the below questions, please dive in...Thanks in advance. 1) Does anybody have done the profiling board life time experiment? 2) The prof
Electronics Forum | Fri Jan 04 14:21:35 EST 2008 | ck_the_flip
If all your doing is trying to measure oven repeatability, but then you wanna do it a bunch of times, have a profiling "board" constructed out of say... delmat, delrin, or some other glastic-type pallet material. Have the T/C's permanently fastene
Electronics Forum | Thu Mar 19 02:35:48 EDT 2020 | franknguyen
Hi, I got a new project, and need to provide customer the ICT (In-Circuit-Testing), FPT (Flying-Probe-Testing) process quotation. The new PCBA contains analog components, digital components, and some BGAs that can support Boundary Scan. Does anyone
Electronics Forum | Mon Oct 21 03:27:15 EDT 2019 | btkhoo68
we would like to monitor ASM siplace feeder, cycle time, nozzle.event using SCADA. Anybody able to provide memory address allocation for above data value to read by SCADA
Electronics Forum | Wed Nov 16 08:53:26 EST 2005 | nkbkiran
Once the gerber files and BOM list are generated by CAD packages for download on to SMT production line....How is the cycle time of that PCB operation determined? Is their information with in Gerber files by which you can estimate, before actual pr
Electronics Forum | Thu Nov 17 13:48:42 EST 2005 | stepheniii
And don't forget to implement the "Scotty" technique for estimating time.