Electronics Forum | Thu Mar 19 12:26:10 EDT 2020 | yuaanliie
You have mostly set in your mind before purchasing PCB i.e. PCB is an acronym for the printed circuit board. Last month I purchased PCB from Great PCB.
Electronics Forum | Wed Mar 11 04:05:02 EDT 2020 | floravictor
Due to the impact of the epidemic, will everyone's purchases be affected? We are pcb factory in Shenzhen, we are already back to work. skype: qjthomasxiao
Electronics Forum | Wed Apr 23 07:27:21 EDT 2008 | realchunks
Floor life of a PCB is rated in years. Are you asking about the solder paste or something else?
Electronics Forum | Wed Apr 23 03:19:30 EDT 2008 | jkhiew
Hi all, Can anyone advise me what is the recommended floor life for pcb assembly prior to wave soldering before drying/degassing ? Thks Joseph
Electronics Forum | Wed Apr 23 17:28:46 EDT 2008 | davef
The need to prebake boards to remove moisture from the board [to prevent voiding] prior to wave soldering is driven by the thickness of through hole plating. * 1 thou [25um] or greater requires no prebaking * LT 1 thou [25um] requires prebaking
Electronics Forum | Fri Apr 25 04:44:56 EDT 2008 | jkhiew
Hi all, I mean after post adhesive oven curing (SMD at bottom side) prior to manual insert of PTH components (top side), what is the recommended storage time prior to wave soldering in order to avoid pin/blow holes and sunken joints issues (pcb asse
Electronics Forum | Wed Apr 23 19:00:39 EDT 2008 | stevek
It depends on the laminate but a PWB is like any other MSL component. Some fab shops are only waranting standard FR4 laminates for 45-60 days when processed at lead free temperatures. The best thing I can say is to try some weight gain/loss experim
Electronics Forum | Tue Jan 04 07:27:43 EST 2000 | Roni Haviv
We are starting to check the Turn-Key issue of electronic cards, includes Logistic & Purchasing, Assembly and electrical test. Does anyone have an experience and some data about "going to T.K." and it's advantages/disadvantages ?
Electronics Forum | Mon Jul 15 18:11:36 EDT 2019 | slthomas
First question - is your company already compliant with and/or certified to AS9001? If not, is your company compliant with and/or certified to ISO 9001:2015? There are several overlapping requirements. If the answer is no to the previous and you pla
Electronics Forum | Sun Jul 14 04:39:35 EDT 2019 | alexeyzb
I have changed job and now i have some problems. Previous experience was with high volume production and not so high quality level (class 1, 2 according IPC). Now i need to produce very high quality (and very expensive) PCBAs in Low volume production
Manufacturer of PCB depaneling and PCB soldering machines since 2005, products include CE approval V-groove PCB depanelizer, PCB router, PCB punching machine, laser depaneling, hot bar soldering machines and soldering robots.
Liwu Industrial Park, Yuanzhou Town, Boluo
Huizhou, 30 China
Phone: +86-138-29839112