Electronics Forum | Tue Jun 01 16:12:49 EDT 2004 | gregf912
The 10k rebuild does not need to be applied every 3-4 months as previosly stated. A cp machine that is running 100% of the time on a 24/7 basis will tack up 10k hours in 12.4 months. Now we all know that this is impossible due to parts shortages, pro
Electronics Forum | Mon Apr 23 11:44:55 EDT 2001 | CAL
650 Standards are also located in the back of IPC JSTD-001. I am currently looking at 4 pages on bow and twist. Percent bow = R1-R2/L x 100 (R1= Highest point; R2=lowest or resting point; l= length) Percent twist=(R1-R2)/(2xL)x 100 Sorry if this is
Electronics Forum | Mon Apr 23 14:03:18 EDT 2001 | Ryan Jennens
Dougie- We,too, have the IPC-A-600F, and the spec. refers to IPC-TM-650 test method in the back of the book. Look on page Number 2.4.22 of the test methods appendix. This outlines the procedure for determining the percentage of bow and twist,
Electronics Forum | Fri Oct 15 10:32:01 EDT 2004 | dscott
I have used fuji XP series for about 3-4 years now. We have XP1, XP2 & XP3 in our Prototype Dept. Excellent machines for this purpose. Very easy to program, can edit at the machine, placement, repeatability, reliability is just like any other Fuji
Electronics Forum | Wed Jun 02 20:36:48 EDT 2004 | Ken
I personally would not get involved with any technology as old as the Q4C. I worked in a factory that had about 20 of those and was not impressed. It seemed like there was always some problem (electro/mechanical) and their service was not "world cl
Electronics Forum | Tue Jan 31 15:40:44 EST 2006 | mgdrouin1
Comp is relay. I've pulled the spec. Max 240. Using Leister h/g with manual temp settings from 1-6 (20 - 600C)set by the operator. Gun was set to setting 4. They are using the heat gun to reflow the solder after SMT but before wave. High fai
Electronics Forum | Thu Aug 21 19:18:47 EDT 2008 | duchoang
My steps are different in that case: 1- Check mounts. Try to adjust origin point until get the pretty good mount positions. 2- Teach fiducials ( Board fids, not panel fids) 3- Use fids, check mount again. 4- If OK, then teach Block Repeat. This alwas
Electronics Forum | Tue Nov 29 14:55:17 EST 2011 | jlawson
N2 is a reflow process widener so to speak, for leaded reflow less of a impact, for LF more impact, and if using finer LF solder pastes T4,T5 and smaller paste deposits generally, it helps widen window for flux in paste in oxide protection during soa
Electronics Forum | Wed May 13 15:26:45 EDT 2015 | cyber_wolf
We are high mix - high changeover aerospace manufacturer. We have 3 1809 MK3 air ovens. There has been absolutely no issues with them. We have 4 MPM Momentums. I looked at DEK but felt the MPM's were put together better. They are very easy to use
Electronics Forum | Sat Dec 18 01:42:57 EST 1999 | sin
Do you have strong technical support team that have related experience SMT EQUIPMENT in your company? If you do, use machine would be alright. If you don't, you need to hire afew because even with brand new machine, you still have a problem either