Electronics Forum | Thu Sep 06 21:03:29 EDT 2001 | Poon Man
Eric, There are a lot of factors leading to lose components. Suppose your machine works properly. Firstly, is there any gap between the support pins and PCB? If yes, the components may be �dancing� during placement. Have you checked the placement s
Electronics Forum | Sun Aug 26 12:40:59 EDT 2001 | stefwitt
I would like to enter the discussion by tossing some numbers in. First of all I don�t like the 3 Sigma value. 3 Sigma are 2000 defects per mio. if I remember correctly. This means, if you have 200 components on the board, then every 10 boards have on
Electronics Forum | Fri May 07 02:27:57 EDT 2004 | Grant Petty
Hi, They do what we need component wise, however I was wondering if anyone had info on reliability, ease of programming. We are looking XP 142 and 242 series chip shooters and fine pitch placers. Regards, Grant Blackmagic Design
Electronics Forum | Mon Sep 13 12:31:41 EDT 1999 | Wolfgang Busko
| Hi, | | Recently encountered missing components problem at the SMT process. | Among 13 chip components from the same part number mounted on the board, only 4 ( located in a same row and next to each other) were missing after post reflow. Checked t
Electronics Forum | Wed Sep 15 20:30:57 EDT 1999 | Bach Huss
| | Hi, | | | | Recently encountered missing components problem at the SMT process. | | Among 13 chip components from the same part number mounted on the board, only 4 ( located in a same row and next to each other) were missing after post reflow. C
Electronics Forum | Fri Jan 29 13:15:42 EST 1999 | E.
SMT Mfg. Equipment: Fuji CP-6/IP-3 - but please all hi-speed chip placer users input are appreciated !! The company that I work for is a C/M which offers both consignment but mostly turnkey work. I am currently running 3 Fuji lines. All parts for th
Electronics Forum | Fri Jan 29 19:22:07 EST 1999 | Tony
| SMT Mfg. Equipment: Fuji CP-6/IP-3 - but please all hi-speed chip placer users input are appreciated !! | | The company that I work for is a C/M which offers both consignment but mostly turnkey work. I am currently running 3 Fuji lines. All parts
Electronics Forum | Fri Jun 12 15:29:51 EDT 2009 | grantp
Hi, We just had delivered one of these and it's incredible. It's an amazing machine, and watching it load such a large board totally accurately, from end to end is amazing. Apparently we took delivery of only the second machine to ship in the world
Electronics Forum | Tue May 25 20:29:41 EDT 2004 | Grant
Hi, That's the interesting point, and I think it's got to do with the design of the placement. You have 8 pick heads in the Hydra head, and they all line up with a tape in the feeder. So in theory when it can pick all 8 components at once, and the
Electronics Forum | Fri Aug 05 08:15:39 EDT 2016 | jdengler
The IP3 specs are: PCB Dimensions Max: 508 mm x 457 mm - Min: 80mm x 50mm Thickness: 0.8 to 4.0mm Component Capacity Tape: 74 - 8/12mm Device Locations Tray: 40 Locations Placing Rate: 0.55 sec/component for small chips 1.25 sec/component for ICs
Products, services, training & consulting for the assembly, rework & repair of electronic assemblies. BGA process experts. Manufacturers Rep, Distributor & Service Provider for Seamark/Zhuomao and Shuttle Star BGA Rework Stations.
Training Provider / Manufacturer's Representative / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
1750 Mitchell Ave.
Oroville, CA USA
Phone: (888) 406-2830