Electronics Forum | Thu Jan 06 06:09:43 EST 2005 | calibration
does anyone know of a LED test solution for multiple LEDs' on a PCB that can be used in an incircuit or a functional fixture
Electronics Forum | Tue Mar 23 03:42:51 EDT 2010 | grahamcooper22
Hi, It is very important to follow IPC JEDEC 33 specification for storage and handing of all MSDs. In many instances defects caused by excess moisture in packages is not immediately evident (pcbs may pass final test) but when pcb has been in the fiel
Electronics Forum | Wed May 15 05:44:04 EDT 2019 | peterchan
1、YSVJ-650B three-group multi- blades cutting machine, multiple sets of tools run at the same time, split the whole piece at one time, greatly improve production efficiency; multiple sets of tool design ensure that the split plate effect is not defor
Electronics Forum | Wed Apr 20 10:09:20 EDT 2011 | accessguy
I have a simple battery powered led array pcb that is turned on and off via rf remote. I want to modify it so that it turns off after 90 seconds, and it flashes or blinks every second or so during those ninety seconds. Can anyone suggest a forum or w
Electronics Forum | Wed Aug 11 18:35:17 EDT 2010 | julie1
Anyone work with or have knowledge about metal core/clad boards? The board I'm working with is approximately 2" X 3/4" aluminum core pcb, in a 56 up array. There are 3 LED placements per board. I'm having trouble getting a consistent screen print.
Electronics Forum | Thu Dec 14 04:42:11 EST 2017 | jineshjpr
Can anybody suggest how can I achieve good solderability in convectional reflow oven If I reduced Convection Air Speed 80%. The whole purpose is to reduce 0402 LED tilting in the convectional reflow and the PCB having QFN with 60 to 120 sec soak, 30
Electronics Forum | Fri Jul 23 14:07:52 EDT 1999 | Carl J. Odle
We are having a process related problem with pullup resistors on a controller card which has a I960 micro-processor. The controller monitors signal inputs and it's own resources then blinks a LED to indicate its working. The problem is that after a p
Electronics Forum | Sun Jul 25 08:54:37 EDT 1999 | Tom Gervascio
| We are having a process related problem with pullup resistors on a controller card which has a I960 micro-processor. | The controller monitors signal inputs and it's own resources then blinks a LED to indicate its working. The problem is that after
Electronics Forum | Fri Jul 30 09:43:44 EDT 1999 | C.K.
| We are having a process related problem with pullup resistors on a controller card which has a I960 micro-processor. | The controller monitors signal inputs and it's own resources then blinks a LED to indicate its working. The problem is that after
Electronics Forum | Mon Jul 26 10:25:12 EDT 1999 | Boca
| | We are having a process related problem with pullup resistors on a controller card which has a I960 micro-processor. | | The controller monitors signal inputs and it's own resources then blinks a LED to indicate its working. The problem is that a
Products, services, training & consulting for the assembly, rework & repair of electronic assemblies. BGA process experts. Manufacturers Rep, Distributor & Service Provider for Seamark/Zhuomao and Shuttle Star BGA Rework Stations.
Training Provider / Manufacturer's Representative / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
1750 Mitchell Ave.
Oroville, CA USA
Phone: (888) 406-2830