Electronics Forum | Tue Nov 10 17:01:17 EST 2009 | jjune
2 days?? WOW! Here at our location, with MyData programming it takes on average for new projects a little over an hour with over 350 new parts. We use Aegis for both our offline programming as well as our MES and definitely have been happy with th
Electronics Forum | Fri Oct 08 00:03:41 EDT 1999 | Dude
Whats the average pay an SMT operator should get i work with fuji panasonic and mydata equipment
Electronics Forum | Wed Apr 23 17:40:33 EDT 2008 | dyoungquist
We are a small OEM that also does EMS for local companies. We run our SMT line 10 hours/day 5 days/week and average 2 changeovers per day. We are using a MyData machine in our line. With the proper mix of magazines and feeders, changeover times ca
Electronics Forum | Fri Jun 10 10:49:06 EDT 2005 | jbrower
Hi James, As my companys process/manufacturing engineer, I set up a program that dramaticly reduced machine down time. Some base numbers; we went from an average of 4-6 hrs set up on our Mydata to setups of under 15 minutes on average and some belo
Electronics Forum | Fri Apr 08 10:48:58 EDT 2011 | billmeye
We have Mydata and you can print a report telling you the average placement time per part number. I monitored a few months of jobs, broke things into package type, grouped packages with similiar times (such as chip components up to 1206, SO-8,14,16
Electronics Forum | Fri Oct 08 11:36:49 EDT 1999 | Bill Barrett
| Whats the average pay an SMT operator should get i work with fuji panasonic and mydata equipment | Although it is dependant upon many things, just to give you an idea $11-$15/hr has been my recent experience. It is more lucratrive if you can get
Electronics Forum | Thu Jan 04 15:39:07 EST 2007 | dyoungquist
While the 85% yield on a per board basis seems low, we are actually running over 99% yield on a per solder joint basis as there are about 17,700 joints per panel. On average, 9 out of 63 boards in the panel need rework. Rework issues include missin
Electronics Forum | Mon Mar 25 09:26:16 EST 2002 | stefwitt
you should also look into the different placement methods and their advantages and weaknesses. A chip shooter with a rotary head and lets say 18 nozzles always places one component and picks one at the same time. PC board and feeder table move while
Electronics Forum | Fri Oct 08 00:36:13 EDT 1999 | JAX
| Whats the average pay an SMT operator should get i work with fuji panasonic and mydata equipment | Why all these payscale questions? Review time?? Pay, in SMT, is determined by what you know and what you can get the machine to do. If you are
Electronics Forum | Fri Dec 28 12:58:40 EST 2001 | cyber_wolf
We currently have 4 Mydata pick and place machines in production.(1)TP-9 ,(2)TP-11's,and a new MY-12 machine. We run 3 shifts five days a week, and we also have a weekend shift. We seem to bend alot of A12,A13,and A14 mount tools.When we are busy, we