Electronics Forum | Wed May 15 05:44:04 EDT 2019 | peterchan
1、YSVJ-650B three-group multi- blades cutting machine, multiple sets of tools run at the same time, split the whole piece at one time, greatly improve production efficiency; multiple sets of tool design ensure that the split plate effect is not defor
Electronics Forum | Fri Apr 09 15:52:57 EDT 2021 | daniellongo
The MPM Accuflex will unload the PCB to the conveyor when an explicit button command is given in Configure/Product transfer/FMI/Advanced/"Unload" or if there is a stretch error and the operator is given the choice to "Unload PCB",
Electronics Forum | Thu Apr 30 01:08:52 EDT 2009 | smtmen
Anybody know how to solve this problem, i have buy one machine panasert HD3C glue dispenser. But during Auto Mode PCB cannot transfer in, there is no loading unloading sensor and make me confuse. Does anybody have wiring diagram for this machine.
Electronics Forum | Wed Aug 31 09:45:36 EDT 2016 | ttheis
I have a smema conveyor connected to the downline fmi connection on my up500 but the fmi sugnals show the coneyor ready signal going ro the upline ready input (screenshot). The downline ready output is activated qhen a board is output from the printe
Electronics Forum | Wed Jan 09 06:37:04 EST 2002 | renocassar
I was contacted in order to set up a factory in order to produce home and car alarms equipment. I wish to use a fully automatic SMT line. That is I want a pcb unloader, glue dispenser, conveyers, Pick and Place machine and unloader. The maximum board
Electronics Forum | Thu Apr 07 06:10:08 EDT 2005 | siverts
There are some equipment out there for this purpose, that roll some type of "sticky paper" over the pcb. BUT with this type of equipmnent, there is a high risk of loading up the pcb:s with static electricity. Therefore You must consider to use some o
Electronics Forum | Tue Aug 12 19:18:34 EDT 2008 | arminski
Hi davef, couple of questions: clarifying costing of direct labor against overhead cost: an operator loading PCB onto the reflow oven is a direct cost, how about the reflow process time of the PCB while travelling inside the reflow, is that an ove
Electronics Forum | Mon Apr 24 11:44:53 EDT 2017 | emeto
It is good to have: conveyor after SPI(if you don't have SPI should be after the printer), conveyor before the oven(inspection station is better), conveyor after the oven - before your destacker if you have one. The rest of it, depends on how long li
Electronics Forum | Tue Dec 09 08:51:56 EST 2008 | pjc
256 LT or Lite, low end fully auto machine, lower res alignment camera, not as accurate and repeatable as GSX. Wiper and Auto Paste dispensing optional. GSX is fully loaded with hi end camera alignment, auto paste, vac stencil wiper, may have auto fl
Electronics Forum | Fri Sep 09 05:42:43 EDT 2016 | jasltd
Hi folks, I'm looking for definitions on the categories from the Management reporting from MYData's (running My9 & MY19 machines TPSYS 2.4) I'd like to understand what the machine classifies into the following: Up time Active Time Run Time I"m buil
Products, services, training & consulting for the assembly, rework & repair of electronic assemblies. BGA process experts. Manufacturers Rep, Distributor & Service Provider for Seamark/Zhuomao and Shuttle Star BGA Rework Stations.
Training Provider / Manufacturer's Representative / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
1750 Mitchell Ave.
Oroville, CA USA
Phone: (888) 406-2830