Electronics Forum | Sun Oct 30 06:13:23 EST 2005 | mika
I am sorry for my poor english, but perhaps you will undertsand:-) The important thing is to get the conveyors straight: The front fixed rail must be parallel with the next one and also the heigt. The heihgt of the prior conveyour should be (but not
Electronics Forum | Wed Jan 20 09:12:03 EST 2016 | anel_elektronik
Hallo, Following problem with CP40CV conveyor: If I start production, put first PCB and after placement PCB is transported to the output of conveyor and I take it out. Next PCB after placement is waiting endless. All sensors are ok. Looks as if t
Electronics Forum | Tue Oct 07 12:40:57 EDT 2003 | ssnow
OEM no longer in existence. hard to find exact match. belt is flat and green. used for PCB transport.
Electronics Forum | Mon Oct 06 18:24:34 EDT 2003 | pjc
what type of belt is it and what material is it? round belt, flat belt, etc... if its from a PCB transport conveyor or other PCB handling system, I recommend you contact the OEM. I have spliced belts before- rubber round belt off old Fuji loader and
Electronics Forum | Thu Jul 22 07:30:21 EDT 2010 | nitronica1
does anyone know where I can get replacement conveyor/drive belts for a Fuji/astro pcb 0.5m conveyor? pref from the UK or europe the length of the belts are approx 630mm and 6mm wide, flat with bumps on bottom side
Electronics Forum | Wed Jul 13 13:23:34 EDT 2011 | kkay
We have multuiple pcb transport conveyors that use the 10mm wide flat green blets on either edge. Does anyone know of a kit to purchase where we could make our own or a company that supplies different sizes? Thanks
Electronics Forum | Fri Jul 28 10:34:14 EDT 2006 | razor9114
Don't forget about Paste height measurement, conveyors, Aqueous Cleaner, Selective Solder machine and possibly an Ionic Tester
Electronics Forum | Mon Jul 12 11:11:25 EDT 2004 | Stefan
For laser marking you don�t require as powerful lasers then for cutting. A 20 Watt laser diode does already a good job. Because of the safety requirements the laser operates in an enclosure, which means more $$$ if you want to use the laser in line
Electronics Forum | Mon Mar 11 07:05:06 EDT 2024 | klauss
while conveyor goes down to relaese pcb, some big compoments are swinging left or right due to high down speed of the conveyor. is there any way to decrease the speed?
Electronics Forum | Mon Aug 31 15:21:04 EDT 2015 | zombee
Dear Users! I have a Topaz pick&place machine, but the conveyor motor is not working. 1st test - production: Start production in "operation" menu: if I put the PCB the entrace of machine, the assembly head-bank picks up the first 8 components (prec
Products, services, training & consulting for the assembly, rework & repair of electronic assemblies. BGA process experts. Manufacturers Rep, Distributor & Service Provider for Seamark/Zhuomao and Shuttle Star BGA Rework Stations.
Training Provider / Manufacturer's Representative / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
1750 Mitchell Ave.
Oroville, CA USA
Phone: (888) 406-2830