3 ipc-a-600 class 2 - 90 degree breakout minimum = results

Partner Websites: ipc-a-600 class 2 - 90 degree breakout minimum = (Page 1 of 1)

Dispense-System-Service-Guide_22290008G.book

GPD Global | https://www.gpd-global.com/pdf/doc/Dispense-System-Service-Guide-22290008G.pdf

machine may need to be leveled both before and after the tie down procedure. If tie down clamps are NOT required, skip to Level Machine. 1. Prepare floor as needed using Spacing & Locations (pg 7.11). 2. Verify a minimum of 30 mm of the foot screw thread is

GPD Global

Dispense System Service Guide

GPD Global | https://www.gpd-global.com/co_website/pdf/doc/Dispense-System-Service-Guide-22290008G.pdf

• Forklift (2 ton capacity) • End wrench • Air lines (capacity of 4 CFM @ 87 psi [113 l/min @ 600 kPa]) • Power cord plug The equipment is provided with a main power inlet; main equipment over-current protection must be provided from the facility dedicated

GPD Global

  1  

ipc-a-600 class 2 - 90 degree breakout minimum = searches for Companies, Equipment, Machines, Suppliers & Information