Technical Library: (2)[0] (Page 1 of 1)

IMPACT OF 0201 COMPONENTS ON CURRENT MANUFACTURING SYSTEMS

Technical Library | 2023-05-02 19:16:57.0

1.5 with a 150μm specification window. For 0201 components, the minimum requirement is CpK > 2.0 with a 100μm specification window. The spec window may need to be reduced down to 75μm if the controls for high volume manufacturing are insufficient. Also directly impacting the placement quality is the ability to apply sufficient solder consistently to the board. The goal is to maintain current printing practices, but the effect of powder size will be examined. This paper will evaluate the impact of placement accuracy and solder powder size on 0201 manufacturing quality.

Motorola Mobility LLC.

  1  

(2)[0] searches for Companies, Equipment, Machines, Suppliers & Information

Circuit Board, PCB Assembly & electronics manufacturing service provider

High Precision Fluid Dispensers
Best SMT Reflow Oven

High Throughput Reflow Oven
Void Free Reflow Soldering

Training online, at your facility, or at one of our worldwide training centers"
Thermal Interface Material Dispensing

World's Best Reflow Oven Customizable for Unique Applications
Fully Automatic BGA Rework Station

500+ original new CF081CR CN081CR FEEDER in stock