Technical Library: 11.12 (Page 1 of 1)

The Perfect Copper Surface

Technical Library | 2015-11-12 19:04:51.0

In order to provide the functionality in today’s electronics, printed circuit boards are approaching the complexity of semiconductors. For flexible circuits with 1 mil lines and spaces, this means no nodules, no pits, and excellent ductility with thinner deposits. One of the areas that has to change to get to this plateau of technology is acid copper plating. Acid copper systems have changed in minor increments since their introduction decades ago. However, the basic cell design using soluble anodes in slabs or baskets has for the most part remained the same. Soluble, phosphorized, copper anodes introduce particulate and limits the ability to control plating distribution.

Technic Inc.

Increase Your Process Control and Lower Cost of Ownership

Technical Library | 2012-11-12 14:06:48.0

With consumers constantly looking for lower prices on their technology products and manufacturers trying to squeak out higher margins from their production lines, the need for process control and lower overhead costs have become even more important. One sector that is often overlooked is the hand soldering area of the factory. Many factories have been struggling with antiquated soldering systems for years. In some cases they are trying to make their investment in stations last much longer than they were designed for, or they are falsely trying to recoup their original investment ‐ all at the cost of higher operating expenses or even worse, reduced operator thru‐put.

Metcal

How to inspect the temperature recovering time of thermal shock chamber?

Technical Library | 2019-11-12 02:09:22.0

Thermal shock test chamber can be used for testing the chemical change or physical damage on composite materials caused by the thermal expansion and contraction of the sample in the shortest time,which is subjected to extremely and continuous high and low temperature environment.so how to check the temperature recovery time of this chamber? Normally we take following steps to inspect the temepratuire recovering time: 1.Install the temperature sensor at the specified position, and adjust the temperature controller of hot zone and cold zone to the required nominal temperature respectively. 2.The temperature increases and reduces respectively,30min after temperature in two zones reach stable status,record temperature value of the measuring point,pls set the temperature value of two zones to be required nominal temperature. 3.The temperature shock test chamber automatically places the inspected load into theh ot zone,select the corresponding retention time according to regulated standard. 4.Set the transfer time,then the inspection load is transferred from hot zone to cold zone, and the temperature of the measuring point is observed and recorded, and then the reverse conversion of the load from cold zone to hot zone is carried out according to the same method, and the temperature of the measuring point is observed and recorded. www.climatechambers.com

Symor Instrument Equipment Co.,Ltd

  1  

11.12 searches for Companies, Equipment, Machines, Suppliers & Information

SMT feeders

Wave Soldering 101 Training Course
fluid dispenser

High Precision Fluid Dispensers
Circuit Board, PCB Assembly & electronics manufacturing service provider

World's Best Reflow Oven Customizable for Unique Applications
High Throughput Reflow Oven

Component Placement 101 Training Course