Technical Library: graham (Page 1 of 1)

Re-Shoring or Near-Shoring Concepts Should be Strongly Considered when the OEM’s Goal is To Deliver Optimum Balance between Landed Cost and Time to Market

Technical Library | 2016-09-29 17:23:51.0

The old tactic of outsourcing to a low cost geography simply to deliver lowest cost direct and indirect labor was never a panacea supply chain solution. In fact, when evaluating solutions for lower volume and higher mix products typically found in the medical, industrial and public safety segments of the OEM market, IL & DL costs are only one subset of the total cost to land the product and service the ultimate customer. In this paper, there will be examination of what actual cost components should be included in a landed cost analysis, the soft costs that an OEM should consider to deliver outstanding performance in quality, logistics and delivery management of the supply chain solution. A detailed comparison using a 'case study' will be presented to demonstrate a total landed cost option versus one that is focused on IL/DL cost.

Kimball Electronics, Inc.

  1  

graham searches for Companies, Equipment, Machines, Suppliers & Information

Void Free Reflow Soldering

World's Best Reflow Oven Customizable for Unique Applications
Circuit Board, PCB Assembly & electronics manufacturing service provider

High Precision Fluid Dispensers
PCB Handling with CE

High Throughput Reflow Oven
Encapsulation Dispensing, Dam and Fill, Glob Top, CSOB

Software programs for SMT placement and AOI Inspection machines from CAD or Gerber.