Technical Library: power start (Page 1 of 1)

Notices in the use of temperature and humidity Test Chamber

Technical Library | 2019-05-06 23:04:05.0

The temperature and humidity test chamber simulate the temperature and humidity, so there are a lot of things customers shoud notice in the process of use, although there is detailed instruction when purchasing the equipment. But some users just know how the device works and start using it. This is very easy to cause problems in the use of the equipment, so Symor intends to describe the safety details during the use of temperature and humidity chamber. 1. Before the test, determine if the sample contains flammable and explosive substances to avoid combustion or explosion during the test. Of course, also make sure there is no flammable and explosive material around the test equipment, otherwise it may cause fire and other accidents. 2, Do not open the chamber door to operate during the experiment, or the gas in the studio may cause the operator to burn and so on. 3. At the end of the test or at the time of regular cleaning of the test chamber, power off the equipment to avoid electrocution accidents. Also, when cutting off the equipment power, pull the power cord to pull out the plug, otherwise it may lead to a rupture of the power cord and so on. You can contact manufacturers if there are some places you donnot understand, do not dismantle and repair the temperature and humidity test chamber without authorization, otherwise it may lead to more serious problems.

Symor Instrument Equipment Co.,Ltd

Dust removal in temperature and humidity Test Chamber (2/2)

Technical Library | 2019-05-21 00:21:26.0

Continue to talk about the dust removal from temperature humidity test chamber. Cleaning and maintenance: 1) Pls remove internal impurities inisde chamber before operation. 2) The power distribution room should be cleaned at least once a year, and the dust can be removed by vacuum cleaner. 3) The exterior chamber must also be cleaned more than once a year, which can be wiped with soapy water. Inspection and maintenance of humidifier: The water storage in humidifier should be replaced once a month to ensure clean water quality, humidifying water tray should be cleaned once a month to ensure smooth flow of water. The inspection of over-temperature protector:during the test: If the temperature is over 20 ℃ ~ 30 ℃ than the maximum value setted,the power supply of the heater will stop, the "OVERHEAT" overt-emperature warning light will automatically turn on but the fan is still in operation, if the equipment runs without operator around,the operator should check the over-temperature protector in advance to ensure wether it has been setted properly before start [wet ball over-temperature protector set to 120 ℃].

Symor Instrument Equipment Co.,Ltd

  1  

power start searches for Companies, Equipment, Machines, Suppliers & Information

2024 Eptac IPC Certification Training Schedule

High Precision Fluid Dispensers
2024 Eptac IPC Certification Training Schedule

High Throughput Reflow Oven
design with ease with Win Source obselete parts and supplies

Internet marketing services for manufacturing companies