Technical Library | 2023-08-16 18:09:06.0
One of our customers involved with Electronics and Aerostructures requested a test to dispense Techspray Wondermask 2204 solder mask. The dispensing locations include large and small screw holes, single through-hole vias, and connector locations consisting of multiple through-hole vias. The process needed to run quickly and reliably.
Technical Library | 2023-09-07 14:38:31.0
A repeat customer specializing in high-technology interconnect, sensor, and antenna solutions, partnered with us to dispense small volumes of solder paste (Indium 10.1 SAC305 T6SG 78%m) onto backplane connectors – gold pads 0.175mm x 0.225mm. We performed a test requiring 0.200mm diameter or smaller dots to demonstrate the dispensing capability required.
Technical Library | 2019-05-06 23:13:09.0
Temperature and humidity test chamber has brought a lot of help to many industrial enterprises, but while it brings convenience to us, we should also take good care of them, otherwise they may be brought into the end-of-life phase ahead of time. The way of maintenance is also very simple. After daily use, the equipment is cleaned regularly, but the cleaning of the test chamber is also very skillful. If the operation is wrong, it may also lead to equipment failure. Let‘s learn how to extend the service life of the temperature and humidity test box together. 1, Pls clean the working room with water after each use, then dry the interior with dry cotton cloth. 2, Pls regularly remove dust from the evaporator inside the equipment, and periodically wipe the equipment to ensure clean and tidy. 3, When doing the test, the sample should be uniformly placed onto sample shelves,and the vent should not be blocked to prevent the influence of the test 4, It is necessary to pay attention to the cleaning of water tanks in peacetime, after the test or when the equipment is not intended to be used for a long time, all the water in the tank should be discharged, otherwise it will lead to the formation of scale inside the tank. The water used in the temperature and humidity test chamber must be pure or distilled water, or long-term use may result in a humidifier or internal pipe clogging. Above are the usual use notice of temperature and humidity test chamber, if customer adhere to the above several points,it is really able to prolong the service life of the equipment.
Technical Library | 2022-08-08 15:06:06.0
Selective soldering has evolved to become a standard production process within the electronics assembly industry, and now accommodates a wide variety of through-hole component formats in numerous applications. Most through-hole components can be easily soldered with the selective soldering process without difficulty however some types of challenging components require additional attention to ensure that optimum quality is maintained. Several high thermal mass components can place demands on the selective soldering process, while the use of specialized solder fixtures, or solder pallets, often places additional thermal demand on the preheating process. Fine-pitch through-hole components and connectors place a different set of demands on the selective soldering process and typically require special attention to lead projection and traverse speed to minimize bridging between adjacent pins. Dual in-line memory module (DIMM) connectors, compact peripheral component interface (cPCI) connectors, coax connectors and other high thermal mass components as well as fine-pitch microconnectors, can present challenges when soldered into backplanes or multilayer printed circuit board assemblies. Adding to this challenge, compact peripheral component interface connectors can present additional solderability issues because of their beryllium copper base metal pins. Key Terms: Selective soldering, drop-jet fluxing, sustained preheating, flux migration, adjacent clearance, lead-to-hole aspect ratio, lead projection, thermal reliefs, gold embrittlement, solderability testing.
Technical Library | 2019-01-23 21:33:32.0
Automated Optical Inspection (AOI) is advantageous in that it enables defects to be detected early in the manufacturing process, reducing the Cost of Repair as the AOI systems identify the specific components that are failing removing the need for any additional test troubleshooting1-3. Because of this, more Electronic Contract Manufacturing Services (EMS) companies are implementing AOI into their SMT lines to minimize repair costs and maintain good process and product quality, especially for new component types. This project focuses on the testing of component package 03015 which is challenging for AOI.
Technical Library | 2016-11-10 08:56:54.0
It goes without saying that every manufacturer wants to ensure they are producing a quality product. Standards and specifications from various organizations provide a guideline from which manufacturers can measure different areas of quality, while also providing the end user with the reassurance that they are purchasing a trustworthy, long-lasting product. Within the wire processing industry there are many standards that manufacturers may choose or be required to adhere to. These standards and specifications are constantly evolving and increasing in detail, especially as monitoring technology improves.
Technical Library | 2018-06-20 13:11:57.0
Manufacturers test to ensure that the product is built correctly. Shorts, opens, wrong or incorrectly inserted components, even catastrophically faulty components need to be flagged, found and repaired. When all such faults are removed, however, functional faults may still exist at normal operating speed, or even at lower speeds. Functional board test (FBT) is still required, a process that still relies on test engineers’ understanding of circuit functionality and manually developed test procedures. While functional automatic test equipment (ATE) has been reduced considerably in price, FBT test costs have not been arrested. In fact, FBT is a huge undertaking that can take several weeks or months of test engineering development, unacceptably stretching time to market. The alternative, of selling products that have not undergone comprehensive FBT is equally, if not more, intolerable.
Technical Library | 2019-08-15 13:31:52.0
Cracks in ceramic chip capacitors can be introduced at any process step during surface mount assembly. Thermal shock has become a "pat" answer for all of these cracks, but about 75 to 80% originate from other sources. These sources include pick and place machine centering jaws, vacuum pick up bit, board depanelization, unwarping boards after soldering, test fixtures, connector insulation, final assembly, as well as defective components. Each source has a unique signature in the type of crack that it develops so that each can be identified as the source of error.
Technical Library | 2019-05-21 00:21:26.0
Continue to talk about the dust removal from temperature humidity test chamber. Cleaning and maintenance: 1) Pls remove internal impurities inisde chamber before operation. 2) The power distribution room should be cleaned at least once a year, and the dust can be removed by vacuum cleaner. 3) The exterior chamber must also be cleaned more than once a year, which can be wiped with soapy water. Inspection and maintenance of humidifier: The water storage in humidifier should be replaced once a month to ensure clean water quality, humidifying water tray should be cleaned once a month to ensure smooth flow of water. The inspection of over-temperature protector:during the test: If the temperature is over 20 ℃ ~ 30 ℃ than the maximum value setted,the power supply of the heater will stop, the "OVERHEAT" overt-emperature warning light will automatically turn on but the fan is still in operation, if the equipment runs without operator around,the operator should check the over-temperature protector in advance to ensure wether it has been setted properly before start [wet ball over-temperature protector set to 120 ℃].
Technical Library | 2017-07-27 16:51:57.0
Reliability Expectations of Highly Dense Electronic Assemblies is commonly validated using Ion Chromatography and Surface Insulation Resistance. Surface Insulation Resistance tests resistance drops on both cleaned and non-cleaned circuit assemblies. It is well documented in the literature that SIR detects ionic residue and the potential of this residue to cause leakage currents in the presence of humidity and bias. Residues under leadless components are hard to inspect for and to ensure flux residue is totally removed. The question many assemblers consider is the risk of residues that may still be present under the body of components.