Electronics Forum: change (Page 326 of 517)

Rad 5 performance: bent lead

Electronics Forum | Mon Jul 08 18:45:53 EDT 2019 | assuredtech

Would you happen to have the Jig used to check that the component itself is in spec with UIC's general specifications? 1.) Component in spec. 2.) Correct 2.5mm pusher on the feeder / dispense head. Also set the conditioner guide where the comp enter

DEK HORIZON 265 Squeege Pressure question

Electronics Forum | Sat Nov 09 19:37:52 EST 2019 | kylehunter

> the issue is the calibration. What you set it for > has to match what it actually reads or you get > the error screen at the end of every pass. If > you go into the maintenance menu ( using the key > next to the system button )

CP-642 specific part missing/inconsistent

Electronics Forum | Tue May 05 06:50:14 EDT 2020 | greezmky

I am having an issue with our CP-642. It will place fine a great deal of the time however when there is a feeder issue or if the cycle changes, after a part is replenished, it will suddenly miss RS1A diodes on the boards for about five to ten boards

SMT Line Performance Measurement

Electronics Forum | Tue Jan 19 10:33:46 EST 2021 | tamasmagyar

Hi Processman, I would say that 92% is realistic if you have low mix - high volume manufacturing. In this case, the only reason for the machines to stop is to: - change reel (on ASM machines you can splice them together, so theoretically with ASM

IP-3 Nozzle Change Error (Chuck Confirm. Sensor ON) SOLVED

Electronics Forum | Tue Jan 05 17:12:20 EST 2021 | greezmky

Before our holiday shutdown an experienced party came in and showed me the PAM process on the IP-3. We made some adjustments, and all was well. Yesterday I found that we may have accidentally mixed up some nozzles, so I verified where each should go

I was deceived?

Electronics Forum | Fri Aug 19 10:02:25 EDT 2022 | FSTechnology1

I was deceived? Hello everyone, I suspect that I have been deceived. Let me first introduce the cause of the matter. about myself I just joined a PCBA company and my job is a website operations specialist. This is my first contact with the PCBA in

Solder Paste Pin Transfer vs Time Pressure Dispense

Electronics Forum | Thu Jul 20 13:32:11 EDT 2023 | spoiltforchoice

I doubt either Mycronic or Essemtec, as the only people who do dispense printing, will want to share their research with you. But clearly they will have followed every valid option to determine what is possible. Time & pressure is not used for anythi

Re: Design Guides

Electronics Forum | Wed Jul 22 12:47:23 EDT 1998 | Earl Moon

| I'm trying to put together a set of design guides for use for new designers | in house or to be sent out for contracted layout work. I would like to start with a top ten list of things that will go wrong if rules aren't available. For example testp

Quad 4C part placement rejection

Electronics Forum | Tue Nov 15 14:01:00 EST 2011 | olddog

Well, everything WAS going OK until I started setting up for a board job (40 boards with about 450 components each - many image repeats). We setup 37 feeders with their parts and started defining the pickups and placements. Part #1 is an SOD123 zener

Re: product changeovers

Electronics Forum | Sat Jul 03 18:14:03 EDT 1999 | Earl Moon

50% reduction in time. One draw back, the availability of feeders... You need 280 feeders max to change over a max capacity of 140 feeder machine (or a variance of a product mix vs. part numbers); then there's 8mm, 12mm, 16mm, sticks feeders that c


change searches for Companies, Equipment, Machines, Suppliers & Information