Electronics Forum | Mon May 13 12:50:35 EDT 2019 | robl
Hi Spoiltforchoice, it depends on what you pay for the printers new, but last time I looked there wasn't much difference in price between the DEKs and the Speedprint if you were buying multiple units. Remember there is huge markups on SMT kit. From
Electronics Forum | Tue Jun 16 22:26:04 EDT 1998 | Dave F
| The company I work for has only 1 SMT line all FUJI 89 vintage, My expierience with the Industry started with this line when it was brought into the company 2 years ago, from day one I've been the Process tech for the line and have learned a great
Electronics Forum | Tue Jun 16 22:19:24 EDT 1998 | Ben Salisbury
The company I work for has only 1 SMT line all FUJI 89 vintage, My expierience with the Industry started with this line when it was brought into the company 2 years ago, from day one I've been the Process tech for the line and have learned a great de
Electronics Forum | Sat Oct 15 10:43:51 EDT 2005 | mahe
sorry to all.Actually i get a Job in a SMT machines manufacturing industry.Next month i join to this factory.So i need lot of information about smt machines (basically i am diploma electronics engineer with 8 years experience in cnc and plc machines
Electronics Forum | Fri Dec 29 11:20:59 EST 2006 | Pete
No experience with 5 of the 6, but have owned Juki for 3 years, after an extensive review of competitive units. Now have a 2010, 2020, 2050 and 2060, all EXCELLENT machines! OUTSTANDING Service organization, No charge for software upgrades, LOW co
Electronics Forum | Fri Mar 26 17:12:17 EST 2004 | ben
I have recently encountered a new pcb design with a very high density of components on either side of the pcb. One of the suggested "fixes" is to use the smt pads as vias i.e. the via will be drilled thorough the centre of the smt pad. My concern i
Electronics Forum | Mon Nov 01 22:16:04 EST 1999 | Dean
Without a detailed description of the suspect parts It is difficult to pin-point the exact solution to your process problem. However, whenever possible avoid non-value added additions to your current process. Here is the reality of the situation:
Electronics Forum | Thu Feb 05 01:53:47 EST 2009 | thirdeyeny
I am a skilled smt operator that pays close attention to detail with my experience in the electronic field for the passed 10 years i proved to be an asset to all companies that i have worked for in providing quality work and ensuring on time delivery
Electronics Forum | Wed May 17 16:48:06 EDT 2000 | rwilliams
The smt world is new to me and I have a lot of learning to do. I need some recommendations as to best way to ship partially assembled circuits. The board is question is double sided. One side is smt and the other is thru hole. Our plan is to have th
Electronics Forum | Fri Nov 08 18:36:31 EST 2002 | leeloo
Nowadays I have a problem, I am in chsrge of the section of smt in my company, have a normal process inside my department with a minimal level of mistakes, the problem happens when the material is liberated to the lines of production on happened for
Main Products: 1. Original new and Original Used SMT/AI Spare Parts. 2. SMT Equipments And Related Machine( SMT Calibration, SMT Feeder Carts,Conveyer etc.) 3. Maintenace and Repair Service Pre-Sales Service Provide details ab
Manufacturer's Representative / Manufacturer / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
Building A, Jiepeng Square, Fuyong
Shenzhen, 30 China
Phone: 0755-33578694