Electronics Forum | Wed May 16 01:26:20 EDT 2018 | godless
I was instaling advantech 02.05(typhoon), Software Version 07 SP10 B06. Software reinstall was used because camera stopped working.
Electronics Forum | Wed May 16 07:03:23 EDT 2018 | dekhead
Recommend E;?configuration backup and install from scratch. Upon post-ghost do not reload configuration files, only machine keyfiles
Electronics Forum | Thu May 17 06:46:39 EDT 2018 | godless
After fresh install and loading only machinekey + stdeaf files it worked, thanks. But still there is camera problem which appeared from the beginning. I attached files where you can see error details. Software reinstallation not solved issue. Then ca
Electronics Forum | Mon Aug 20 09:49:57 EDT 2018 | dontfeedphils
Not entirely clear on your question. We don't coat any of our hardware (assemblies are coated prior to hardware installation), so if coating needs to be reworked after this, then hardware removal is needed.
Electronics Forum | Thu Jul 26 10:02:46 EDT 2018 | cyber_wolf
Load part on 0201 feeder Install .4mm nozzles in machine Load program and press start button. Feeders, nozzles and machine must be within factory specifications.
Electronics Forum | Fri Aug 10 18:31:10 EDT 2018 | ks0707
Absolutely I will share the solution with you if I find something. Thomas, thank you for your help. Have a great weekend!
Electronics Forum | Thu Jan 24 09:47:38 EST 2019 | my3sons
We use 4140 steel (same as a lot of other OEM's). The user will need to pre-flux and tin before installing in the machine.
Electronics Forum | Wed Jan 16 14:14:19 EST 2019 | mattkehoe
We have an older MPM SPM machine, circa 2001 that is having a hard time reading the PC hard drive. Worked fine until yesterday. We are looking for a software install package for it or, preferably, a PC with the software on it.
Electronics Forum | Tue Feb 05 13:56:44 EST 2019 | scotceltic
Hello, looking to see if anyone has any contacts in China (preferably Shanghai area). Looking for a company to quote, recommend and install a full SMT line based on our companies specs. A full service integrator is basically what I am looking for ?
Electronics Forum | Mon Apr 15 12:10:00 EDT 2019 | slthomas
"To qualify the equipment for production use, you need to only do IQ, OQ." Even in a scenario where you're installing a piece of duplicate equipment, how do you demonstrate (and record) that the new machine provides acceptable product?