Electronics Forum: smt placement (Page 46 of 91)

HOT AIR Bench top

Electronics Forum | Tue Jan 11 19:38:44 EST 2011 | hegemon

There are a number of manufacturers of Benchtop Hot air stations. For what you are describing, look at Hakko as well as A.P.E. (if they are still around, they made a great little machine called a ?Chipmaster?, and if you added preheat, I think you

Odd Form Placement

Electronics Forum | Tue Jul 27 10:43:08 EDT 1999 | Angie Vale

We currently have a single SMT line consisting of a Sanyo chipshooter in line with a Siplace 80F4 and we are soon going to install a odd form placement machine (probably JOT) into this line prior to the oven. This means going to intrusive reflow, whi

Re: It's already done!!!

Electronics Forum | Fri Apr 03 08:19:36 EST 1998 | Jon Medernach

| Hello, | We are currently trying to design and ultimately implement a system that will be able to count and manage component placement for three Sanyo chipshooters on three SMT lines. | As the number of components decreases in the reels we want to

Re: SM Line Solution

Electronics Forum | Thu Apr 27 21:11:00 EDT 2000 | Dave F

Ken: There is no complete package solution to the concerns you have. You need to weave you way through this project. I�m generalizing when: Placement machine OEM: * Knows their machine (your interests are served if this is the proper machine for

Re: BGA PAd Soldermask

Electronics Forum | Mon Feb 21 11:22:21 EST 2000 | K. Ckak

Hi Kurt, I agree with Dave F. I had exact same problem with PBGA placement. We requested our PCB vendor to plug/tent via (button printing) after HASL with SR1000 which worked well in the long run. There are couple of failure modes associated wit

Re: SMT Placment Reliability

Electronics Forum | Fri May 05 20:07:26 EDT 2000 | TNT

Charles, The percentage of misplaced components can increase with the number of components, because as you increase the number of placements the travel of the PCB,for a fixed turret machine, increases in table speed and distance. The slower the trav

Re: SMT PCB prototype

Electronics Forum | Wed Apr 26 22:34:49 EDT 2000 | Eric Chua

1. Verify all the part had load to machine. Get ready for the profile. 2. Run the board with double side tape. Is better to run one board for each machine. 3. Verify all the placement ( missing, misalgnment,etc )and check the value using meter for a

Re: BGA PAd Soldermask

Electronics Forum | Mon Feb 21 11:22:21 EST 2000 | K. Ckak

Hi Kurt, I agree with Dave F. I had exact same problem with PBGA placement. We requested our PCB vendor to plug/tent via (button printing) after HASL with SR1000 which worked well in the long run. There are couple of failure modes associated wit

Re: PTH connectors mounted on SMD process

Electronics Forum | Tue Dec 28 09:36:34 EST 1999 | Dan Woodward

Certainly automatic placement, preferably with vision system assistance will yield a more repeatable process. Process repeatability (paste deposition, connector placement, reflow cycle, etc.) will be your key to success here. Another possibility yo

SMT Production

Electronics Forum | Tue Apr 23 03:48:00 EDT 2002 | mitchell

The metioned process will work, but I do have 1 Question, How are the PTH comp. being inserted? If automated insertion is going to be used the process may have to change. Topside SMD - then Auto insert PTH, the reason for this, is depending on the p


smt placement searches for Companies, Equipment, Machines, Suppliers & Information

KingFei SMT Tech
KingFei SMT Tech

Main Products: 1. Original new and Original Used SMT/AI Spare Parts. 2. SMT Equipments And Related Machine( SMT Calibration, SMT Feeder Carts,Conveyer etc.) 3. Maintenace and Repair Service Pre-Sales Service Provide details ab

Manufacturer's Representative / Manufacturer / Equipment Dealer / Broker / Auctions / Consultant / Service Provider

Building A, Jiepeng Square, Fuyong
Shenzhen, 30 China

Phone: 0755-33578694