Full Site - : quad ivc 115 mk2 (Page 1 of 2)

Quad IVC MK2

Quad IVC MK2

Used SMT Equipment | SMD Placement Machines

I have a Quad IVC with the PPM Windows XP upgrade.  This means it has the new computer, and electronics.  If you are interested, please make me an offer.  I know the upgrade itself was around $7000.

Cusack Music

Quad IVC

Quad IVC

Used SMT Equipment | SMT Equipment

2 x Quad IVC MK2 SMT Placement Machines $6999 Each 1609 Elapsed Hours, 8690 Hours Quad VU3 Fiducia Rrecognition Camera Quad VU6 Dark Field Illuminator Quad Align Centering PCs & Monitors, Manuals, Spares 100 x 8mm Tape Feeders 3 Feede

AMC

Quad IVC Mk2

Quad IVC Mk2

Used SMT Equipment | Pick and Place/Feeders

Quad Systems IVc Mk2 Pick and Place System. Computer has been upgraded to Windows XP. 8680 hrs. CyberOptics Laser Alignment for “alignment on the fly” placement operation. Vue3 (downward-looking fiducial camera). Automatic belt transport fo

Rantec Power Systems Inc.

Quad IVC MK2

Quad IVC MK2

Used SMT Equipment | Pick and Place/Feeders

Complete QUAD IVc Mk2 Pick and Place Assembly Line Three Pre-Owned Quad IVc Mk2 Pick and Place Machines with 120 tape assorted feeders, 5 vibrating tube feeders and one MT-20 matrix tray feeder elevator containing 20 shelves. Machine comes a Centra

Hammer House

foxboro 12621 PEN

foxboro 12621 PEN

New Equipment | Components

22510 PART 22705 PART 10114KX PCB ASSEMBLY 10115BP PCB ASSEMBLY 101-4 RACK CONSOTROL FLUSH MOUNT 4UNIT MOUNTING 111-A INDICTAOR 111-A-L INDICTAOR PNEUMATIC CONSOTROL HIGH-LOW ALARM LIGHT 121003D D ETECTOR 122-FE RECORDER 2PEN PNEUMATIC PROCES

zhengzhou yuzhe electronic technology co.,ltd

Quad IVC 115 Component placement.

Electronics Forum | Thu Mar 02 04:24:46 EST 2006 | walbone

Hi, We have recently purchased a Quad IVC 115 pick and place machine but are finding it difficult to place SOT23 and similar components. The Visual alignment system rejects the components. We have manually measured and also got the system to measure

Quad IVC 115 Component placement.

Electronics Forum | Thu Mar 02 04:50:25 EST 2006 | bobpan

oh....for the feeders moving 2 parts....you must teach a pickup repeat. Make an extent in the pickup editor and attach it to repeat with pick and make it a 2x1 with an 80 mil offset. The machine will then pick the part that is out of the sensor first

Quad IVC 115 Component placement.

Electronics Forum | Thu Mar 02 08:37:15 EST 2006 | walbone

Thank you very much. I swapped the component length and width measurements in Autoprogram and it now places the SOT23's with image verification no problem. As for the 0402's I am still working on this. Pick and place is very new to me, well I start

Quad IVC 115 Component placement.

Electronics Forum | Thu Mar 02 04:47:24 EST 2006 | bobpan

If you have an older machine that has cyberoptics you might want to try to put a pickup theta of 90. I believe there was a problem with that type of part. Also use non-leaded alignment and scan the part near the top of it. As for 0402 parts.........

Re: Starting an SMT line

Electronics Forum | Sun Sep 06 12:46:22 EDT 1998 | Phillip Hunter

| We are investigating equipment for a new SMT line. We are an OEM doing thru hole assembly and now must decide whether to do SM assembly in house or sub-contract out. We are a low volume/high board mix company. | Our boards are mixed tech with SM on

Sm t t net
  1 2 Next

quad ivc 115 mk2 searches for Companies, Equipment, Machines, Suppliers & Information