Technical Library: (2.2) (Page 1 of 1)

How to fill water into the temperature humidity test chamber? (2/2)

Technical Library | 2019-05-16 02:25:15.0

limatest Symor wants to tell you that humidity is not only the most important thing in the chamber, but also the temperature In order to facilitate customers to add water, our temperature and humidity test chamber is to place the water tank at back of the equipment.Just open the baffle to see the water tank and the water level meter next to the tank,then add enough water to the tank. However, in addition to manual water addition, our temperature and humidity test chamber has equipment that can automatically add water. Only by connecting the water pipe at the water filling port can it be automatically replenished when there is a shortage of water, which is suitable for high humidity test for a long time.

Symor Instrument Equipment Co.,Ltd

Dust removal in temperature and humidity Test Chamber (2/2)

Technical Library | 2019-05-21 00:21:26.0

Continue to talk about the dust removal from temperature humidity test chamber. Cleaning and maintenance: 1) Pls remove internal impurities inisde chamber before operation. 2) The power distribution room should be cleaned at least once a year, and the dust can be removed by vacuum cleaner. 3) The exterior chamber must also be cleaned more than once a year, which can be wiped with soapy water. Inspection and maintenance of humidifier: The water storage in humidifier should be replaced once a month to ensure clean water quality, humidifying water tray should be cleaned once a month to ensure smooth flow of water. The inspection of over-temperature protector:during the test: If the temperature is over 20 ℃ ~ 30 ℃ than the maximum value setted,the power supply of the heater will stop, the "OVERHEAT" overt-emperature warning light will automatically turn on but the fan is still in operation, if the equipment runs without operator around,the operator should check the over-temperature protector in advance to ensure wether it has been setted properly before start [wet ball over-temperature protector set to 120 ℃].

Symor Instrument Equipment Co.,Ltd

  1  

(2.2) searches for Companies, Equipment, Machines, Suppliers & Information