Technical Library | 2010-06-23 21:59:03.0
Quality control is one of the main bottlenecks in the production of micro-opto-electromechanical systems/microelectromechanical systems (MOEMS/MEMS) because each structure on a wafer is serially inspected and scanned stepwise over the entire wafer area.
Technical Library | 2019-06-18 03:23:42.0
After-sale service Climatest Symor® strictly controls every production procedure,our main after-sale service procedure is as follow: 1) Email Climatest Symor® about the fault description(Pictures or video is preferred) 2) Within 1 working days, Climatest Symor® gives feedback or solution (If Climatest Symor® needs customer to take pictures about some parts of the machine, customer should cooperate accordingly to settle issues. 3) If checked that some parts(except glass nozzle) is possible broken by non-artificial reason, If necessary, customer deliver the broken part to Climatest Symor®, later Climatest Symor® send the repaired part or new part to customer. If unnecessary, Climatest Symor® will make delivery for the new part to customer directly. Remark:During warranty, Climatest Symor® is responsible for delivery fees both ways and parts fees.After warranty, Customer is responsible for the delivery fees both ways,Climatest Symor® will provide the parts to customer by cost price.
Technical Library | 2009-03-25 17:14:11.0
This article presents design guidelines for helping users of HDMI mux-repeaters to maximize the device's full performance through careful printed circuit board (PCB) design. We'll explain important concepts of some main aspects of high-speed PCB design with recommendations. This discussion will cover layer stack, differential traces, controlled impedance transmission lines, discontinuities, routing guidelines, reference planes, vias and decoupling capacitors.
Technical Library | 2014-07-24 16:26:34.0
Wire bonding a die to a package has traditionally been performed using either aluminum or gold wire. Gold wire provides the ability to use a ball and stitch process. This technique provides more control over loop height and bond placement. The drawback has been the increasing cost of the gold wire. Lower cost Al wire has been used for wedge-wedge bonds but these are not as versatile for complex package assembly. The use of copper wire for ball-stitch bonding has been proposed and recently implemented in high volume to solve the cost issues with gold. As one would expect, bonding with copper is not as forgiving as with gold mainly due to oxide growth and hardness differences. This paper will examine the common failure mechanisms that one might experience when implementing this new technology.
Technical Library | 2017-11-15 22:49:14.0
While a significant level of voiding can be tolerated in solder joints where electrical conductivity is the main requirement, voiding at any level severely compromises thermal conductivity. For example, in LED lighting modules effective conduction of heat through the 1st level die attach to the substrate and then through the 2nd level attach to the heat sink is critical to performance so that voiding in the solder joints at both levels must be minimized. (...) In this paper, the authors will review the factors that influence the incidence of voids in small and large area solder joints that simulate, respectively, the 1st and 2nd level joints in LED modules and discuss mitigation strategies appropriate to each level. They will also report the results of a study on the effect on the incidence of voids of flux medium formulation and the optimization of the thermal profile to ensure that most of the volatiles are released early in the reflow process.
Technical Library | 2016-10-27 16:24:23.0
Press-fit technology is a proven and widely used and accepted interconnection method for joining electronics assemblies. Printed Circuit Board Assembly Systems and typical functional subassemblies are connected through press-fit connectors. The Press-Fit Compliant Pin is a proven interconnect termination to reliably provide electrical and mechanical connections from a Printed Circuit Board to an Electrical Connector. Electrical Connectors are then interconnected together providing board to board electrical and mechanical inter-connection. Press-Fit Compliant Pins are housed within Connectors and used on Backplanes, Mid-planes and Daughter Card Printed Circuit Board Assemblies. High reliability OEM (Original Equipment Manufacturer) computer designs continue to use press-fit connections to overcome challenges associated with soldering, rework, thermal cycles, installation and repair. This paper investigates the technical roadmap for press fit technology, putting special attention to main characteristics such, placement and insertion, inspection, repair, pin design trends, challenges and solutions. Critical process control parameters within an assembly manufacturing are highlighted.
Technical Library | 2019-12-12 02:43:44.0
Today we discuss the reason that causes temperature humidity chamber to alarm,In most cases, the equipment alarm is caused by the improper operation in the process of use, which mainly includes following reasons:that are refrigeration system, temperature system and circulating system. First, Refrigeration system 1, refrigeration compressor overpressure alarm. If the refrigerant pressure exceeds the set value, it will stop and alarm at the same time. At this time, the fault must be eliminated and then manually reset. 2, short phase power supply, phase sequence alarm. When the external power supply of the equipment is out of phase or the phase sequence is changed, it will stop and alarm at the same time. 3. The circulating cooling water is short of water to alarm. When the water pressure of the cooling circulating water system is insufficient, it will stop and alarm at the same time, and it must wait for the fault to be eliminated and reset at the same time before it could run normally. 4, refrigeration compressor overheating alarm. When the coil of the compressor is overheated and the power supply of the line is not normal, it will stop and alarm at the same time. Second, Temperature system 1, the overtemperature alarm in the chamber. The sensors in the channel and the sample area are equipped with overtemperature protection devices, and there are also overtemperature protecter on the control panel. When the temperature in the working chamber exceeds the setting value on the controller, it will stop and alarm. 2. sample overtemperature protection. When the temperature in the sample area exceeds the protection temperature set by the controller, it will stop and alarm at the same time. The overtemperature protection of the sample is divided into upper limit protection and lower limit protection, which can be set according to the demand, Third,Circulating system 1. The alarm is caused by the overheating of the circulating fan. When the coil of the fan is over-heated, the alarm will be stopped at the same time. 2. The fan over-current alarm. When the current of the fan exceeds the allowable value, the alarm is stopped at the same time, and the normal operation can only be carried out after the fault maintenance of the overcurrent is completed. This is what we talk about today,if you have more questions,let us know.
1 |