Technical Library | 2009-10-29 11:45:52.0
The globalization of markets results in stronger competition with clearly noticeably cost pressure. For companies producing electronic equipment it is therefore of existential importance to reduce production costs whilst maintaining a consistently high quality level of the manufactured products. Manual repair soldering that is expensive, time-consuming and cost intensive is already unacceptable due to the required quality and the reproducibility of the whole manufacturing process.
Technical Library | 2019-05-06 23:04:05.0
The temperature and humidity test chamber simulate the temperature and humidity, so there are a lot of things customers shoud notice in the process of use, although there is detailed instruction when purchasing the equipment. But some users just know how the device works and start using it. This is very easy to cause problems in the use of the equipment, so Symor intends to describe the safety details during the use of temperature and humidity chamber. 1. Before the test, determine if the sample contains flammable and explosive substances to avoid combustion or explosion during the test. Of course, also make sure there is no flammable and explosive material around the test equipment, otherwise it may cause fire and other accidents. 2, Do not open the chamber door to operate during the experiment, or the gas in the studio may cause the operator to burn and so on. 3. At the end of the test or at the time of regular cleaning of the test chamber, power off the equipment to avoid electrocution accidents. Also, when cutting off the equipment power, pull the power cord to pull out the plug, otherwise it may lead to a rupture of the power cord and so on. You can contact manufacturers if there are some places you donnot understand, do not dismantle and repair the temperature and humidity test chamber without authorization, otherwise it may lead to more serious problems.
Technical Library | 2014-10-09 17:51:35.0
Over the last years more and more international newspapers reported in Europe / USA and Japan: "Tunnel train got stuck under the Channel – thousands of people stranded", "Recall of thousands of cars to workshops for control and repair", "Power Failures left households without energy for hours." Very often news like this relate to malfunctions of electric and electronic circuits under adverse conditions or sometimes even in normal operating environment (...) The presentation will deal with all kinds of aspect of cleaning to ensure the reliability of electronic circuitry in ever changing operation conditions in the most important industrial areas.
Technical Library | 2018-06-20 13:11:57.0
Manufacturers test to ensure that the product is built correctly. Shorts, opens, wrong or incorrectly inserted components, even catastrophically faulty components need to be flagged, found and repaired. When all such faults are removed, however, functional faults may still exist at normal operating speed, or even at lower speeds. Functional board test (FBT) is still required, a process that still relies on test engineers’ understanding of circuit functionality and manually developed test procedures. While functional automatic test equipment (ATE) has been reduced considerably in price, FBT test costs have not been arrested. In fact, FBT is a huge undertaking that can take several weeks or months of test engineering development, unacceptably stretching time to market. The alternative, of selling products that have not undergone comprehensive FBT is equally, if not more, intolerable.
1 |