Electronics Forum | Fri Nov 04 01:24:53 EDT 2011 | kevintough
From what I have seen of the Omron software your most interesting challenge and prerequisite for a clean and complete inspection is a full understanding of the color triangle and it's settings. I know you can find almost the same interface/GUI in the
Electronics Forum | Wed Nov 03 14:08:55 EDT 2010 | clampron
Good Afternoon, I would throw my vote in to Mirtec as well. I also had an opportunity quite a few years ago to compare three systems side by side. At the end of the evaluation, the Mirtec stood out over the rest. Over the past several years, I was in
Electronics Forum | Fri Dec 03 16:00:48 EST 2010 | glenseely
When faced with high mass, high cost, sensitive PCBs and now with the added challenges of Pb-Free Vapor Phase is the only safe reflow method for component and joint integrity. A-Tek is the National Distributor for Asscon Vapor phase reflow. Asscon
Electronics Forum | Thu Dec 02 09:07:18 EST 2010 | patrickbruneel
Hi Jacki, Water soluble flux was for the majority used in the USA in the 80’s and 90’s under the motto “flux your problems away” (water soluble fluxes are very active). Water soluble fluxes have never been popular in the rest of the world. The main
Electronics Forum | Mon Jan 10 17:12:53 EST 2011 | gosswald
I have been researching older lower cost used Pick and Place machines and so far I am leaning towards the Quad IV C. There seems to be a fair amount of these units around and I have heard some pretty good things about them on some of the past posts.
Electronics Forum | Tue Feb 01 13:35:32 EST 2011 | rgduval
We have recently taken to setting jobs up in BOM order. So, when the job is kitted (for turn-key jobs), or verified (for consigned jobs), the job is organized in either BOM order or in the order shown on the Components in Layout report printed from
Electronics Forum | Mon Mar 07 11:54:46 EST 2011 | rway
Now I have a clearer picture of your operation. It seems your company does not want to incur the cost of board redesign, and I thought it was the initial investment of the capital equipment that had them scared. You stated, "Unfortunately I can't g
Electronics Forum | Mon Mar 21 02:41:29 EDT 2011 | kemasta
Hi It's me again. Our products need to pass a chamber test 45c/36hrs after the PCBA completed batch of functional tests and assemble in to case. We found 1 unit was functioning for 24hours in the chamber, but hang after that. We tried to re-boot the
Electronics Forum | Wed Jun 15 13:40:49 EDT 2011 | hegemon
I have seen this before with larger PBGA components. When installed using a rework system, I would advise Convective rather thn IR. In my experience having high power (not high temp) convection is the only way to deal with these problematic devices
Electronics Forum | Wed Jun 15 22:27:40 EDT 2011 | pkamath2
Hello, My company recently installed a Positive Displacement Pump on a GSM Pick @ Place machine for dispensing chipbonder (loctite 3621) dots before mounting chip components. The head uses Universal stand nozzles (single port-small dot, dual port 0