Electronics Forum | Mon Apr 15 21:00:57 EDT 2013 | dman97
Hi, I have another problem. This time with a vintage 1995 GSM machine. Upon startup, I am seeing a part to pad LED tower time out. The GSM knowledge base says to change they relay at CR1 on the power distribution board. On this machine, the power
Electronics Forum | Wed May 15 12:53:19 EDT 2013 | mchawg
I am having difficulty programming/inspecting a large SMT Relay. It is a dual in-line through-hole package with 5 leads per side formed to a gullwing configuration on .100" pitch. We have programmed it as a SOW10 pkg and got usable lighting values bu
Electronics Forum | Mon Aug 06 14:24:12 EDT 2018 | dleeper
I had a similar problem once on an acculfex. The root cause was a short on the one the wire harnesses connected to the print head. If I recall, most of the relays in an accuflex are actuated by the 24 volt bus, so if you have a short anywhere in tha
Electronics Forum | Sat Dec 29 01:28:48 EST 2018 | emmamillathompson
We are using a smps for our comm pcb , a relay and a current sensor, which uses 4.2v, 12v and 5v respectively. We are controling one phase of a three phase 5hp water motor. Also smps circuit and relay output are in parallel so output load doesnt effe
Electronics Forum | Mon Dec 07 11:33:25 EST 2020 | ecogroup
Getting these errors: No command response from handler (0x1000) .... DpBlockWriteL: TimeOutWait for ACK .... Loading SYSTEM data to DPRAM is failed ..... Failed to create empty document ..... No command response from handler (0xffff) ..... Faile
Electronics Forum | Fri May 28 19:43:32 EDT 1999 | Peter Wong
We are looking into frameless stencil systems for screen printing. Outside frame size of 29x29. Pros: smaller storage requirements and cheaper stencils. Cons: sharp metal edges, additional change over time required Can anyone relay their experien
Electronics Forum | Thu Mar 28 02:30:00 EST 2002 | ianchan
Hi Dave F, we tried to contact: 1) Jack Crawford, 2) Mel Parrish, but the (above supplied) links provided give error messages, is it possible to help relay this posting to them respectively for their help/review? thanks.
Electronics Forum | Tue Mar 25 10:58:46 EST 2003 | davef
The best off-the-shelf option is: Go back to your customer and have them relay-out the board. This will: * Reduce labor costs. * Improve reliability by lowering the chance of package cracking caused by less than optimal lead forming.
Electronics Forum | Fri Sep 16 08:36:45 EDT 2005 | ajay
check some relay might be bad on MTU. we faced similar problem in IP3.
Electronics Forum | Sat Sep 16 15:52:32 EDT 2006 | magszoo
yes we already swapped the relays and they worked fine on the second machine. How would we verify it is the ballscrew if that is a possibility?