Electronics Forum | Wed May 17 16:02:53 EDT 2000 | Mark J. Braska
Is there any data on the total cost of labeling PC boards. Included in this cost would be the labels, ribbons,printers & maintenance,software, and engineering & operator expenses(fully burdened). I am searching for an independant analysis of the co
Electronics Forum | Tue Sep 20 15:47:13 EDT 2005 | fastek
Wow! How would it be possible to spend $700-$800 in labor to repair a single board? What are labor burdens these days? $30-$40 per hour at most?
Electronics Forum | Wed Mar 31 20:01:22 EDT 2021 | emeto
SPI is especially useful when you start going to lower pitch/size components. Best use is inline to identify issues. It is a powerful tool in the right hands and a burden when operated by wrong people. I value it more than the AOI equipment.
Electronics Forum | Mon Mar 10 10:28:23 EST 2003 | pjc
Tact times published by placement equipment suppliers usually do not account for board load/unload. Placement time standards set for your boards must include load/unload time. I measure from first fiducial read on board 1 to first fiducial read on bo
Electronics Forum | Thu Jun 01 21:59:10 EDT 2000 | Ray Chartrand
Does anyone know the current cost to repair a defective solder joint? I seem to recall a number quoted a few years ago of $1.03 per joint with burden of overhead. I've also seen numbers from 50 cents to 50 dollars per joint.
Electronics Forum | Tue May 30 20:56:27 EDT 2000 | Dave F
Chua: No AI on SMT troubleshooting that I'm aware of. Don't dispare though, we're here to help you. Consider checking the SMTnet archives. There is a bountiful amount of information there. Good luck. And we hope over time that the burden of hav
Electronics Forum | Mon Sep 27 16:11:05 EDT 2004 | Kevin Haywood
Our low volume, high mix SMT operation is looking to benchmark with others. Our benchmarking survey will be ready for distribution by October 29, 2004. Respondent burden is expected to be less than 30 minutes. The data collected will be provided "
Electronics Forum | Thu Apr 08 14:54:39 EDT 2010 | davef
We can make the numbers come-out looking impressive either way. In real life, our sense is: fully burdened, it is a little less expensive to use a contractor. Now, we're only talking costs. Non-cost factors often end-up putting on the brakes and t
Electronics Forum | Mon Oct 04 10:26:59 EDT 1999 | Morris
I am working on trying to define a cost per placement measure in our SMT assembly operations. Does anyone know where I might find a published industry average that we may compare to? I�ve heard it stated that an industry average is less than $0.01
Electronics Forum | Fri Sep 16 09:14:29 EDT 2005 | actech
We have just launched a new contract assembly house and I was wondering if there was anybody out there that had an honist formula for calculating labor cost for the purpose of bidding assembly work, "is there a good canned software package that actua