Electronics Forum | Sat Oct 10 09:01:46 EDT 1998 | Al Carrillo
| we currently have a siplace line(80s/f) and are inhereting a fuji line from another site. I need an objective comparison between the two. What are the strengths and weaknesses of the fuji with regard to programming, operating and maintenance. any c
Electronics Forum | Mon May 10 17:21:03 EDT 2004 | smt..
I work with Fuji equipment For over 10yrs�. Cp3, cp4.cp6.cp7, ip1, ip2, ip3, qp341, qp242, qp351. Also, work with MYDATA, SAMSUN, and QUAD AMISTAR�. Fuji is the best in my opinion.
Electronics Forum | Mon May 10 17:21:08 EDT 2004 | smt..
I work with Fuji equipment For over 10yrs�. Cp3, cp4.cp6.cp7, ip1, ip2, ip3, qp341, qp242, qp351. Also, work with MYDATA, SAMSUN, and QUAD AMISTAR�. Fuji is the best in my opinion.
Electronics Forum | Fri Oct 08 17:07:19 EDT 2004 | Christopher
Hi > > For throughput seimens is the best and > footprint is smallest Fuji Machine ist the best on the world. I working on the Cp 6,CP 7, QP 3421 and Qp 351. Best regards Christopher
Electronics Forum | Thu Jun 10 16:23:11 EDT 2004 | davem
Hi Grant, In previous positions I've had experience with the Fuji CP43, CP6, CP642, CP643, CP65, IP3 & QP242. In operating, training and process engineering capacities. Presently, I'm working with 2 SMT lines (in a process engineering capacity) wit
Electronics Forum | Wed May 19 16:57:08 EDT 2004 | ricardof
We have in our facilities in Mexico more than 150 FUJI machines (CPs, IPs, QPs, GPs), they're in fact Bombproof, but it is not amazing to do that with 1206, SOTs on SOPs, we just feel a kind of disappointed with that 10K hours service, that means yo
Electronics Forum | Tue Jun 01 16:12:49 EDT 2004 | gregf912
The 10k rebuild does not need to be applied every 3-4 months as previosly stated. A cp machine that is running 100% of the time on a 24/7 basis will tack up 10k hours in 12.4 months. Now we all know that this is impossible due to parts shortages, pro
Electronics Forum | Tue Oct 12 10:24:22 EDT 2004 | sdsmt
i worked with cp6s in 1995 and 1996. we always had missing part problems that was machine related. we had to inspect every board for missing parts. it was a disaster, imho, but i expect a chipshooter to consistently load chips. otherwise, it was
Electronics Forum | Mon Aug 08 08:48:42 EDT 2016 | sumote
Jerry, Thank you! Anyone have the CP6 specs?
Electronics Forum | Tue Jan 14 11:02:59 EST 2003 | soupatech
I found a feeder with a 2mm pitch and was told that although it was made for the CP4, it would work with the CP3. Before we throw out a thousand bucks, has anyone had experience loading parts off of a 2mm pitch tape with the CP3? The part is a 1.6